Concrete Formwork System’s Operating Platform

Loading Port:China Main Port

Payment Terms:TT or LC

Min Order Qty:-

Supply Capability:-

Product Description:

1. Structure of Operating Platform

As operating platform, the shaft platform is mainly used in the concrete pouring of elevator shaft, equipment shaft, stair shaft of high-rise building etc.

 

2. Main Features of Operating Platform

A) The length of shaft beam is adjustable. Lmin=1450, Lmax=5800.
B) Flexible structure makes lifting easier.

 

3. Operating Platform Images

 

 

 

4. Operating Platform Specification

Lmin=1450, Lmax=5800.

 

5. FAQ of Operating Platform

1) What can we do for you? 

We can ensure the quality of the vinyl banner and avoid extra expenses for customers.    

We can provide you the professional design team.    

We can provide fashionable and newest styles for you.    

We can design the artwork for you.    

Please feel free to customize.  

 

2) What promises can be done by us?

If interested in Operating Platform, please feel free to write us for any QUOTE.

If printing required, please advise asap because the whole set need much more time to complete.

Please DO check goods when courier knocks your door and contact us asap if any issue.

 

3) What about of our after-sale service?

Response will be carried out in 24hours  after receiving any complain or request.

If the products are not based on the requirements, there will be the relevant compensations made for you.  

 

 4) What about the package and shipping time?

Packing:  As Customer's Requirements

Shipping: We have various shipping ways for our customers, such as express which including TNT,  DHL,  FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.  

Shipping time:Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. Other mass qty of Operating Platform, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days.