Loading Port:Shanghai
Payment Terms:TT OR LC
Min Order Qty:100 m
Supply Capability:100000 m/month
This product is applied to overhead power transmission and distribution lines.wires in operation will be unevenly stressed, after the joints are pressed, outlets of connecting pipe should be covered with moisture-proof paint to prevent corrosion;
4. When the wires are installed, sag stress of all the wires at the same gear should be the same, and within the range permitted by the limited distances to the ground and exceeding the distance for protection of building, the conducting wire stress can be higher by 10-15% than normal tension.applied to overhead power transmission and distribution lines.wires in operation will be unevenly stressed, after the joints are pressed, outlets of connecting pipe should be covered with moisture-proof paint to prevent corrosion;
4. When the wires are installed, sag stress of all the wires at the same gear should be the same, and within the range permitted by the limited distances to the ground and exceeding the distance for protection of building, the conducting wire stress can be higher by 10-15% than normal tension.