Colorful Ceramic Stone Coated Metal Roofing Tile

Loading Port:Shanghai

Payment Terms:TT OR LC

Min Order Qty:600 pc

Supply Capability:400000 pc/month

Product Description:

Structure of Colorful Ceramic Stone Coated Metal Roofing Tile:

1. Raw material of Colorful Ceramic Stone Coated Metal Roofing Tile: 

     1) 0.4mm thickness-galvalume steel sheet( steel plate thickness can be customized as request);

     2) colorful stone chips.

2. Product color of Colorful Ceramic Stone Coated Metal Roofing Tile: 

     1) gam blue,ancient black, brick red, filemot, sepia, desert golden, black&white, red, asian red, asian green, green, ocen blue.

     2) special color: can be made as request.

3. Usage of Colorful Ceramic Stone Coated Metal Roofing Tile: can be used in wooden frame, steel frame, steel truss, concrete roof. 

4. Types of Colorful Ceramic Stone Coated Metal Roofing Tile: classic, grid, wood grain, nosen,wave/ roman.


Main Features of the Colorful Ceramic Stone Coated Metal Roofing Tile:

1. useful life of more than 30 years;

2. windproof, waterproof, uv protection, anti-seismic, heatproof;

3. beautiful and moden;

4. easy installed. It is suitable for all kinds of building roof.


Images of Colorful Ceramic Stone Coated Metal Roofing Tile:

Colorful Ceramic Stone Coated Metal Roofing Tile

Colorful Ceramic Stone Coated Metal Roofing Tile

Colorful Ceramic Stone Coated Metal Roofing Tile

Colorful Ceramic Stone Coated Metal Roofing Tile


Specification of Colorful Ceramic Stone Coated Metal Roofing Tile:

Quantitysix corrugated
Size1345*420mm
Thickness0.4mm
Length of cover1280*370mm
Weight2.6kg per piece
1*20ft container10000pcs
Area of coverage0.473m2
Package and loading600pc/pallet, 16pallet/20" container, 8000-10000pcs with accessories per 20" container

FAQ of Colorful Ceramic Stone Coated Metal Roofing Tile:

1. Q: What's the MOQ of the Colorful Ceramic Stone Coated Metal Roofing Tile?

     A: 600pcs/ per pallet

2. Q: What's the lead time of the Colorful Ceramic Stone Coated Metal Roofing Tile?

     A: 20 days after advance payment.

3. Q: What's the lowest tempreture of the contruction?

     A: -40 degree celsius