Cold Rolled Steel Coil price shipping from china

Loading Port:Shanghai

Payment Terms:TT or LC

Min Order Qty:50 m.t.

Supply Capability:65450 m.t./month

Product Description:

The raw material of cold rolled steel coil/sheet is high quality hot rolled product.

Cold rolled steel coil/sheet as defined in the EN 10130/98 standard, with guaranteed maximum mechanical characteristics and guaranteed minimum ductility and formability.

It is suited to formation by bending or drawing, which enables complex parts to be produced in good repeatable conditions and intended for indoor use.

 

Standard and Grade :

Cold rolled steel coils

JIS G3141-2005

EN10130-2006

ASTM  A1008-12a

Commercial quality

SPCC

DC01

CS Type A/B/C

Drawing quality

SPCD

DC03

DS Type A/B

Deep drawing quality

SPCE    SPCF (non aging)

DC04

DDS

Extra deep drawing quality

SPCG(non aging)

DC05/06

EDDS

 

Pictures of Cold rolled steel coils

Cold Rolled Steel Coil price shipping from china

Cold Rolled Steel Coil price shipping from china

Cold Rolled Steel Coil price shipping from china

Cold Rolled Steel Coil price shipping from china

 

Application :

Automobile Industry, White Goods, Home Applicances, Oil & Air filters, semi product for coating with enamel or zinc, construction & building sector, air-conditioning, furniture, radiators, tubes, profiles, mechanical construction, shelving, containers, drums 

 

Packing:

Cold Rolled Steel Coil price shipping from china

.png

 

FAQ:

1. Can you offer OEM to me? What about MOQ?  

Of course, we are a professional with OEM manufacturer for 9 years. the MOQ can be 50 ton/ order..

2. How to guarantee the quality of the products?

We have established the international advanced quality management system,every link from raw material to final product we have strict quality test;

We resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.

3. How long can we receive the product after purchase?

Usually within thirty working days after receiving buyer’s advance payment or LC.

We will arrange the factory manufacturing as soon as possible.

The cargo readiness usually takes 15-25 days, but the shipment will depend on the vessel situation.

4.How Can I Get Some Sample?

We are honored to offer you free sample, but courier charges will be on your side.