CNBM Tons of Potassium Sulfate (SOP) Project with Hydrochloric Acid

Loading Port:Shanghai

Payment Terms:TT OR LC

Min Order Qty:1 set

Supply Capability:1 set/month

Product Description:

                Tons of Potassium Sulfate Project

General

CNBM is committed to building the best fertilizer factory for customers. With many years of experience in design and construction of potash fertilizer production line, our team continuously improve on technology and equipments of SOP production line, which can make more economic benefits and extend the lifetime of the equipments. CNBM built the SOP plant in many countries, such as Philippines, Indonesia, India, Egypt, etc. The high quality service has won the public praise for CNBM, the Clients are also willing to repurchase to expand the scale of production line. Although potash fertilizer production line is a mature technology, but CNBM has unique technology which is different from others. The proposal is is for potassium sulfate Plant with the capacity of 100,000MTPA in powder.

Reference list

No.CaseDate
1The project of SOP in Iran for 40,000 MTPAIn 2017 Year
2The project of SOP granulation in Philippines for 10,000 MTPAIn 2015 Year
3The project of SOP in Egypt for 100,000 MTPA
4The project of SOP in Egypt for 60,000 MTPA
5The project of SOP granulation in Egypt for 20,000 MTPA
6The project of SOP in Egypt for 20,000 MTPAIn 2013 Year
7Technical consultant of Sop in Saudi for 20,000 MTPA
8Overhaul the furnace in IndonesiaIn 2011 Year
9The project of Calcium Chloride in Egypt for 30,000 MTPA 
10The contractor of SOP in Philippines for 20,000MTPA In 2008 Year
11Overhaul the furnace in IndonesiaIn 2007 Year
12The contractor of SOP in Philippines for 10,000MTPAIn 2006 Year
13The equipment supplier of SOP in Indonesia for 10,000MTPAIn 2004 Year
14The contractor of SOP in Philippines for 10,000MTPA


Scope of Supply

The project basic and detailed engineering design, including the process details, layouts, arrangements, technical specifications, and all other required items technical aspects.

 Detailed engineering which will be required for the operation and maintenance of the plant.

 Specifications and procurement of equipment as required for the use and operation of process.

Complete technical documentation and instructions required for fulfillment of erection, preparation for start-up, performance testing, operation and any other special equipment.

Equipment packing and China inland transportation and transport from China port to Iran port.

Supervision of Installation, commissioning and start-up of the plant.

Supply of erection material as piping, pipe fittings, valves, flanges, gaskets, bolting material, instrumentation, tubing, paints for protection against corrosion and heat insulation material.

Training of personnel at our site during the unit construction and initial operation.


Exclusion Items in Scope of Supply 

Civil and Architecture detail design.

Civil construction, include plant and general buildings; lighting; lightening protection; communication system; road; pavement; etc.

Power substation; transformer system (becoming 380 V; 3 phase; 50 Hz), main-power cable and related system which out of the battery limit.

Emergency power supply system

Laboratory apparatus

Fire-fighting system.

Raw materials and part of utilities for this plant.

Any government permit related to the equipment; system; building  utilization.

Local customs clearance and inland transportation to project site for import portion.

Any tax and duty in country where plant located.

Bank charges incurred outside of China

Round ticket of engineer,accommodation,meals, communication for engineer and workers

Working permit and such related expenses for overseas technicians/engineers and project management staffs.

Utilities consumption which used for the installation work including water, electric .etc.

The large equipments and tools for installation, which include crane, welder, cutting machine , forklift hoist ,other tools and assistant workers for installation.

Note: the sand, red brick and wooden for building furnace is not included in supply scope. 

 Battery Limits

ItemBattery Limit
Raw Material 
 MOP At inlet of feed hopper
 Sulphuric acid Will be provided at the inlet of day tank in battery limits with isolation valve
Product
 Potassium Sulphate Inlet of SOP Product Silo 
 HCL To HCL Pipeline of HCL Tank Farm
Utilities
 Compressed air Will be provided at one point within battery limits with isolation valve
 Process water Will be provided at one point within battery limits with isolation valve
 Cooling Water Will be provided at one point within battery limits with isolation valve
 Natural gas Will be provided at one point within battery limits with isolation valve


Others

1.1 Chinese codes and standards shall be adopted during Engineering design. All equipment and material shall be made by the manufacturer with in China, including some manufacturer of Sino-foreign joint venture or some manufacturer adopted foreign technology.   

1.2 CNBM has capability to make the supervision of installation for the Plant; precondition as below:

 All the equipment should be on site;

The civil job should be finished, cleaning the site

The client should give good cooperation on labor and installation tools. 

1.3 This proposal is made based on the normal condition of security, exclude Force Majeure. Once we receive Safety Precaution from Ministry of Foreign Affairs and Chinese Embassy, we will not dispatch workers to site and also can not guarantee the schedule. 


Pictures

.jpg

CNBM Tons of  Potassium Sulfate (SOP) Project with Hydrochloric Acid

CNBM Tons of  Potassium Sulfate (SOP) Project with Hydrochloric Acid

CNBM Tons of  Potassium Sulfate (SOP) Project with Hydrochloric Acid


3D drawings :

CNBM Tons of  Potassium Sulfate (SOP) Project with Hydrochloric Acid


CNBM Tons of  Potassium Sulfate (SOP) Project with Hydrochloric Acid

CNBM Tons of  Potassium Sulfate (SOP) Project with Hydrochloric Acid

CNBM Tons of  Potassium Sulfate (SOP) Project with Hydrochloric Acid