Climbing Frame boiler scaffolding for construction

Loading Port:China main port

Payment Terms:TT OR LC

Min Order Qty:1 m.t.

Supply Capability:5000 m.t./month

Product Description:

The leading boiler scaffolding manufacturer in China which possess of national patent of boiler scaffolding (Patent No: ZL 01 218702X).

With 15-year experience and latest computer aided design technology, we can make special design and products according to the boiler’s specification and requirement.

    Our boiler scaffolding systems are widely applied to many power stations and get good reputation with fast, safe and efficient features.

 

Competitive Advantages:

 

>Complies with International Safety Standards of BSEN 1004:2004  

>Lightweight and high tensile aluminum alloy tubs and castings weighing as little as one   fifth of an equivalent steel system  

>With simple interlock system ensuring trouble-free Installation with no welding or tools required  

>With the foldable units module ensuring fast erection, e.g.: about 25 hours for the boiler installation of a 500MW  

>With the diversified foldable units making sure of functional uses  

>Significant revenue savings with less down-time and lower fixed costs  

  For instance, for a 600 MW power plant, if it costs RMB 0.18 per degree of  electricity in China, and it can save about 40 hours downtime with Kangde Aluminum Scaffolding , so a power plant can save cost in a overhaul work as the following :
   40 hours* 600MW/h*0.18RMB/degree=RMB4.23million =USD630,000

>High durability and stability with no maintenance required  

>Technical support throughout the project stage from design to installation  

>With 15-year experience in design, production, sales and technical support as well as after-sale service. 

>With recorded experience in the design, production, sales and technical support as well as after-sale service for more than two hundred boiler access systems. 

>With the high tensile unique tube specially for cold-formed joint system ensuring 20-year longevity Warranty

Parts of Performance list for Electric Power Station Boiler Aluminum Scaffolding

Draft tube scaffolding for Pengshui Hydropower Station of Datang International Group
Draft tube scaffolding for Chang River Electric Power Limited Company
Boiler scaffolding for Fengzhen Power Station in Inner Mongolian
Boiler scaffolding for Jiujiang Power Station in Jiangxi

Boiler scaffolding for Erdusi Power Station in Inner Mongolian
Boiler scaffolding for Datang Tuokrtuo Power station in inner Mongolian
Boiler rush maintenance scaffolding for Daihai Power sastion in inner  Mongolian
Boiler scaffolding for Panshan Power station

Boiler scaffolding for Haerbin Third power station
Boiler scaffolding for Huaneneg Qinbei Power Station