Loading Port:Shanghai
Payment Terms:TT OR LC
Min Order Qty:1 m²
Supply Capability:100000000 m²/month
1. Structure of Climbing Formwork Description
The Formwork Center of CNBM dedicates to the design, manufacture and supply of formwork and scaffolding in fields of Civil Engineering, Bridge-Road Projects,Tunnel and Dams.
The Formwork Center of CNBM is managed by highly technical professionals having in depth knowledge, competence to design, develop and manufacture excellent quality products.
The workshop covers an area 8000M2, and in the plant there are automatic finger jointing machine, rack shaping and mortising machine, multi-blade saw, multi-spindle moulder, glue spreader and other advanced equipment. The production capacity of timer beams is 3000M/day.
2.Formwork Products Series
Climbing Formwork for Construction Building
-Formwork system:
-Timber-beam formwork:
1,TableFormwork:
2,Walland Column Formwork:
3,Auto-climbing Formwork:
4,Auto-climbing Protection Panel:
-Steel-frame formwork:
Wall and Column Formwork:
-Aluminum-frame formwork:
Slab Formwork
-Whole aluminum formwork
Slab,Wall,Column and Beam Formwork
-Wholesteel formwork
Wall,Column Formwork,and BrigdeFormwork
-Scaffoldingsystem
-Steelprop & Beam clamp
-Ring-lock scaffolding, Cup-Lock scaffolding,
-Tower scaffolding
3. Climbing Formwork Images
Climbing Formwork for Construction Building
4.FAQ
Climbing Formwork for Construction Building
. If need any technical and building assistance, we could provide on-site professional staff for instruction.
. Please DO check goods when courier knocks your door and contact us asap if any issues.
What about the package and shipping time?
.Packing: As Customer's Requirements
.Shipping: We have various shipping ways for our customers, such as express which including TNT, DHL, FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.
.Shipping time:
Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days.
Other mass qty of Timber-beam Formwork, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days.