Chinese Best Cold Rolled Steel Coil JIS G 3302 --Excellent Process Capability

Loading Port:China main port

Payment Terms:TT OR LC

Min Order Qty:50 m.t.

Supply Capability:10000 m.t./month

Product Description:

Chinese Best Cold Rolled Steel Coil JIS G 3302 --Excellent Process Capability

 

Brief Introduction

Cold Rolled Steel is steel thathas been worked below its recrystallization temperature by passing it between apair of rollers. Recrystallization temperature is the temperature at whichgrains in the lattice structure of the metal have been rearranged, leaving it freeof strain and deformations. Cold Rolled Steel is pre-treated before being coldrolled with a process known as pickling, which uses strong acids to removescale and other impurities. The Cold Rolled Steel is then passed throughrollers to reduce its thickness. Most cold rolling takes place in multiplepasses and as the size of the Cold Rolled Steel is further reduced, itsstrength and hardness both increase, but its ductility decreases. After coldrolling, heating the metal up in a process known as annealing can restore someof its ductility. The final Cold Rolled Steel may be manufactured in the formof sheets, strips, bars, or other forms.

 

Application

It’s widely used in outdoor andinterior decoration, furnishing manufacturing, home appliance, automobile etc.

 

Main Specification

COLD  ROLLED STEEL

THICKNESS

0.3-0.5MM

WIDTH

600-1250MM

SHEET  LENGTH

0-6000MM

COIL ID

508MM OR  610MM

SURFACE  TREATMENT

MATT  FINISH/BRIGHT FINISH, OILED/DRY

ANNEALING  METHODS

BRIGHT  ANNEAL/BLACK ANNEAL

COIL  WEIGHT

1-25MT

 

Advantage

1. High Quality SurfaceFinish

2. High Dimensional Precision

3. Excellent mechanicalproperty

FAQ 

1.How to guarantee the quality of the products?

We have established the international advanced quality management system,every link from raw material to final product we have strict quality test;We resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.

2. How long can we receive the product after purchase?

Usually within thirty working days after receiving buyer’s advance payment or LC. We will arrange the factory manufacturing as soon as possible. The cargo readiness usually takes 15-25 days, but the shipment will depend on the vessel situation.