China Top Quality Prime Electrical Tinplate for Packaging

Loading Port:Tianjin

Payment Terms:TT OR LC

Min Order Qty:100 m.t.

Supply Capability:40000 m.t./month

Product Description:

China Top Quality Prime Electrical Tinplate for Packaging Description

Steel Type    MR
Temper(BA&CA)    T1~T5, DR8, DR9
Coating    1.1~11.2g/m2 (Both Equal and Differential)
Thickness and tolerance    0.15~0.50mm(Tolerance: _+0.01 mm)
Width & tolerance    300~1000mm (Tolerance: 0~3mm)
Cut length & tolerance       450~``50mm (Tolerance: 0~3mm )
Coil inside diameter     420/508mm
Coil Weight       3~10 MT
Passivation       311
Oiling             DOS
Surface Finish     Bright, Stone, Silver, Matte
Packaging           Seaworthy Standard with wooden pallet
Standards Available     GB/T2520, JIS G3303, ASTM A623M & EN10202
Special specitications are available on request.

China Top Quality Prime Electrical Tinplate for Packaging China

Tinplate can ensure food hygiene and minimize the possibility of corruption, effectively

prevent the danger to health, but also in line with modern convenience in tinplate packaging

of canned food diet, rapid demand, tea packaging, coffee packaging, health careproduct

packaging, candy wrappers, cigarette packaging, gift packaging, food packaging containers

are preferred.As well as other miscellaneous cans of the oils and fats cans, chemicals

cans, beverage cans, spray cans, and and so on on.

China Top Quality Prime Electrical Tinplate for Packaging Images

 

China Top Quality Prime Electrical Tinplate for Packaging

China Top Quality Prime Electrical Tinplate for Packaging

China Top Quality Prime Electrical Tinplate for Packaging

China Top Quality Prime Electrical Tinplate for PackagingSpecification

China Top Quality Prime Electrical Tinplate for Packaging

FAQ of China Top Quality Prime Electrical Tinplate for Packaging

 

How long does it take to get the product if i place an order?

With the process of your requirements,we will pack and deliver in 3-7 days.If it is by sea shipment,it will take 15-45 days depending on different locations.