ceiling mounted air conditioner for commercial KFR-120QW/VS

Loading Port:Shanghai

Payment Terms:TT OR LC

Min Order Qty:1 unit

Supply Capability:10 unit/month

Product Description:

Quick Details

Condition:

New

Brand Name:

CNBM

Place of Origin:

JIA,china China (Mainland)

Use:

Room,room

Power Source:

Electrical

Power Type:

AC

Type:

Central Air Conditioners

Cooling/Heating:

Cooling/Heating

Certification:

CE,RoHS

Capacity (btu):

48000

COP:

3

EER:

2.15

Power (W):

4800

Voltage (V):

220

Model Number:

KFR-120QW/VS

color:

white

warranty:

18months

kind:

central air conditioners

voltage:

220

model:

KFR-120QW/VS

brand:

Chunlan

name:

ceiling mounted air conditioner for commercial

Packaging & Delivery

Packaging Detail:safe carton package for export
Delivery Detail:15days

Specifications

air conditioner
1.sim body embedded in ceiling,
2.Save mroe space
3.Harmonize with your decorated room
4.Comfortable

 air conditioner

 

ceiling mounted air conditioner for commercial

 

Product Description

 

 1.sim body embedded in ceiling,Save mroe space.Harmonize with your decorated room

 

2.High efficient filters keep the dust out to avoid feculent air .you can breathe freshly

 

3.the auto-lifting of air -inlet arill is remote controlled,no need for climbing high and convenient for maintenance(VL series does not have this function)

 

4.Operation centrum is manufactured with super quiter technologh and outdoor unit is installed faraway from room,Noises are isolated perfectly.

 

5.Branded compressor generates powerful enerygy and strong cooling and heating capacity,which can meet your request for temperature swiftly.

 

5,Warranty Policy:

 

We guaranty 18 Months warranty for the products.

 

A.Repair include:compressor/fan motor/control panel/Receiver modules,thermal controller and other spare parts.

 

B.Because all the quality issues we should bear the cost maintenance and spare parts.

 

One of the following does not belong to the scope of the repair,But fees may apply maintenance

 

1,Damages caused during the transportation,load,installation which made by upload, transportation ,installation principal.

 

2,During the debug,damages caused by inappropriate test behaviors should be on charge by the debug team.

 

3,After debugging is completed and the equipments can be work normally,any mistaken manual operations made by the users should be on charge for the damage.
4,Any movements,dissemble and repair /maintenance operated by other company or person which leads to damage