Casting Ductile Iron Top Cup and Pressed Steel Bottom Cup for Cuplock Scaffolding System

Loading Port:Tianjin

Payment Terms:TT OR LC

Min Order Qty:10000 pc

Supply Capability:10000 pc/month

Product Description:

Quick Details

Material:

Ductile Iron, Steel Q235/Q345

Surface:

Electro Galvanized/Painted/HDG

Weight:

0.5kgs

Name:

Casting Ductile Iron Top Cup and Pressed Steel Bottom Cup

Catagory:

Scaffolding System

Process:

Casting, Forged, Pressed

Component:

Top/Bottom Cup,Ledger Blade, Standard, Ledger, Bracket, etc

Application:

Highways/Subways, Bridges, Tunnels

Advantage:

Durable, Stable, Skid-proof, Antirust

Manufacturer:

OEM Service is Available





Packaging & Delivery

Packaging Detail:As the Requirment of Clients
Delivery Detail:20days

Specifications

Casting Ductile Iron Top Cup and Pressed Steel Bottom Cup 
Material: Ductile Iron/Steel 
Process: Casting/Pressed/Forged 
OEM

 

 


Product Description


Name:  Casting Ductile Iron Top Cup and Pressed Steel Bottom Cup

Category: Scaffolding system

Material: Ductile Iron/Steel (Q235/Q345)

Weight: 0.5kgs

Surface:  Electro Galvanized/Self Color/Painted/HDG

Component: Standard, Ledger, Strengthened ledger, Transom Beam, Diagonal, Bracket, Top cup, Bottom cup, Ledger blade, etc. 

Application: Highways/Subways, Bridges, Tunnels and Fire Electrical Engineering, Marine Engineering 

Advantage: Durable, Stable, Skid-proof, Antirust, Easy to assemble & Dismantle

OEM service is available 

Items or goods can be manufactured according to your standards