Cantilever Formwork with Durable Using Time and Trustful Quality

Loading Port:Tianjin

Payment Terms:TT OR LC

Min Order Qty:200 pc

Supply Capability:3000000 pc/month

Product Description:

 

1. Structure of  Cantilever Formwork Description 

 

Cantilever Formwork is  mainly used in the concrete pouring of pier, high buildings, and so on. The concrete lateral pressure is entirely supported by anchor system and the wall-through tie-rods, additional reinforcement is not needed. The construction is easy, rapid and economical.  A single pouring height is high and the finished concrete surface is perfect. Cantilever formwork has several types, the structure is similar, and has its own different characteristic. Can use them according to actual demand.

Main cantilever FormworkPJ200 & PJ240,CB-240 etc.

 

2. Main Features of  Cantilever Formwork

 

-easy to assemble 

-simple structure.

-easy, rapid and economical.

 

3.  Cantilever Formwork Images

 

 

Cantilever Formwork with Durable Using Time and Trustful Quality

 

Cantilever Formwork with Durable Using Time and Trustful Quality

 

 

4.   Cantilever Formwork Specifications

 

Anchor  system

Anchor system is the most important supporting part. The system is made of five parts shown below. There into, tensile bolt, anchor shoe and bowl-climbing cone can be taken out for reusing after the concrete pouring.

Tensile bolt M30/L= 110

Anchor shoe

Bowl-climbing cone M30/D15

High-strength rod D15

⑤Ancor plate D15

 

Cantilever Formwork with Durable Using Time and Trustful Quality

 

Cantilever Formwork with Durable Using Time and Trustful Quality

 

 

5.FAQ of  Cantilever Formwork

     

1) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you. 

2) What about of our after-sale service?

   . Response will be carried out in 24hours  after receiving any complain or request.

   . Steel Frame Formwork GK120 cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.   

4) What about the package and shipping time?

    .Packing: wood package and adhesive tape

    .Shipping: by sea

     Shipping time: Normally small orders, it just1week business days to arrive your hand; When comes to the customs declaration, 

     it may need 2weeks.