Loading Port:China main port
Payment Terms:TT OR LC
Min Order Qty:1 set
Supply Capability:999999999 set/month
Application
Canopy can be applied to Gas station, parking lot,playground, sport area, campuses etc.
Features
1. Module Patented design ,prevents debris build-up;Umodularization has better heat dissipation system,keep the temperature of the LED chips and the driver in the safety range,so ensure the lamps long lifespan and low lumen attenuation.
2. Use waterproof wire connector,wire connection become easier ,much more convenient ;use a large ring seal for the lens, sealed and reliable;Module and connection design can optimize construction and assembly,allows for easy maintenance,upgrade and SKD for local assembly.
3. Professional design for the luminous intensity distribution, meet all kinds of lighting requirements,overall spot is rectangular.
4. Professional design with flexible installation ability, installation angle can be adjusted among -5°,0°,5°,10°,15° without changing the lamp post. The installation position of different angles are visible, convenient for installation and adjusting the lamp’s angle .
Installation instructions:
1、Pre-design the cut-out on the ceiling according to the the gas light’s specification,refer to diagram(1);
· 2、Take out the gas light from box,use a wrench to remove the brackets which fixed by screws on both sides of the light,then take off the four countersunk flat head head screws from the frame,separate the housing and frame,refer to diagram(2);
3、Put the body into one side of ceiling,make the external cable get out from the frame to connect with waterproof connector end body③、waterproof connector main cap②、and waterproof connector main body①(fixed with screws),refer to(3);Then fix the waterproof connector main cap into the waterproof main body(make sure fixed very firm,20Nm tightening force);Then fix the waterproof connectro end body into the main cap(use 3kg strength to pull the cable until it immovable, refer to(4);
4、Put the frame insert into ceiling cut-out,then use hexagon bolt screws fix the two brackets,turn into flat washers、spring washers、nuts,use hexagon wrench fix the bolt head,open-end wrench to fix the nuts(30Nm tightening torque).During locking operation,both mounting brackets and screws slide up and down to adjust the distance to the (T) and fasten the ceiling,refer to(5);
5、Move the body connected with grid by Process③ into the frame, aim the four screw hole with the frame,use the four M4 cross recessed nuts fixed in the light and tighten it. Refer to(6)。
FAQ:Could you introduce more about CNBM?
CNBM is a China state owned company and always offer financial support to customers .