Cellular Confinement System of Geocells - Biaxial Geogrid for Softbed Foundation

Loading Port:Qingdao

Payment Terms:TT OR LC

Min Order Qty:30000 m²

Supply Capability:1000000 m²/month

Product Description:

Structure of  Biaxial  Geogrid

Biaxial Plastic Geogrid is a kind of new favorable earthwork base material to strengthen the road surface and roadbed.This product is made by weaving and covering fiberglass filament. It is featured by high vertical and horizontal tensile strength, low unit extension, high flexibility, and favorable high and low temperature resistance. The products after surface covering own the favorable property of alkali resistance and aging resistance.

Main Features of the Biaxial  Geogrid

Packaging & Delivery

Packaging Details:PP bags or PE film. Or Packed as customers' requests.
Delivery Detail:10-20days after the contract is effective

 

Biaxial  Geogrid Images

 

Biaxial Geogrid Used In Softbed Foundation

Biaxial Geogrid Used In Softbed Foundation

Biaxial Geogrid Used In Softbed Foundation

 

 Biaxial Geogrid Specification

SpecificationEGA30-30EGA50-50EGA80-80EGA100-100EGA120-120
Mesh size(mm)25.4×25.4or12.5×12.5
Breaking strength≥(KN/m)Warpdirection305080100120
Across warp305080100120
Elongation at break≤(%)Warp direction3
Across warp3
Elasticity modulus(GPA)

67

Thermal tolerance()-100~280

 

 

FAQ

We have organized several common questions for our clients,may help you sincerely:

Q: How about your company?

A:Our company are one of the largest geosynthetic products supplier in the world.We have the products experience more than 20 years.Already export to USA/Germeny/Australia/Zambia/Brazil etc.more than 20 countries.Almost 10years.Our products including Geocell/Biaxial Plastic Geogrid/Geomembrane/Geotextile/Geonet etc.

Q.Does your products have good qualitity?

A:Yes,we have do many big projects such as the 2008 Beijing Olympic BIRD NEST. Divert water from the south to the north project. And our products have CE certificate also.

Q:How long can we receive the products after purchase?

A:In the purchase of product within three working days, We will arrange the factory delivery as soon as possible. The pecific time of receiving is related to the state and position of customers.Commonly 15-20 working days can be delivery.