Best Quality and Cheap Price of Carboxyl Methyl Cellulose

Loading Port:Shekou

Payment Terms:TT OR LC

Min Order Qty:20 m.t.

Supply Capability:1000 m.t./month

Product Description:

1.  Structure of Carboxyl Methyl Cellulose Description(CMC):

Name:Carboxy Methylated Cellulose,Sodium CMC

Molecular Formula: C6H7O2(OH)2OCH2COONa

CAS NO. 9004-32-4

H.S. Code: 39123100

E number :E466

2.     Main Features of Carboxyl Methyl Cellulose (CMC):

3.    1.high degree of substituiton,good uniformity of substitution;

4.    2.high transparency, viscosity and water loss can be controlled;

5.    3.suitable for fresh water, sea water, saturated brine slurry;

6.    4.stabilize soft soil structure, prevent collapse of wall of a well;

7.    5.can improve mud-making volum,reduce filteration loss.

 

 

3.Carboxyl Methyl Cellulose Images

 

Best Quality and Cheap Price of Carboxyl Methyl Cellulose

Best Quality and Cheap Price of Carboxyl Methyl Cellulose

Best Quality and Cheap Price of Carboxyl Methyl Cellulose

 

4.Carboxyl Methyl Cellulose Specification

type

 

ITEMS

Degree of

substitute

(DS)

viscosity mpa.s

chloride %

PH

moisture %

Pb

%

Heavy metails

Application

PM7

≥0.7

300-600

≤2.0

6.5-8.0

≤10

≤0.0002

≤0.0002

Pharmaceutic Adjuvant

 

PM7

600-1000

FM6

≥0.60

300-600

≤2.0

6.5-8.0

≤10

≤0.0002

≤0.0002

Food additive

FH6

800-1200

FH6

≥1200

FFM9

≥0.9

300-800

≤1.8

6.5-7.5

≤7

Used in acid drink

FFH9

800-1200

IM8

≥0.8

300-600

≤5.0

6.5-8.0

≤10

Oil drilling,geology,paper,building

IH8

800-1200

IH6

≥0.6

800-1200

≤7.0

6.5-8.0

≤10

Textile,printing

 

IM6

300-600

IH9

≥0.90

≥1000

≤3.0

6.5-7.5

≤5.0

Toothpaste,silk,paper

IH10

≥1.0

OH6

≥0.6

800-1200

8.5-10

≤10

Oil drilling,textile,geology, printing

OM6

400-600

≤40

OL4

≥0.4

200-400

>9

≤10

Geology,oil drilling

248

200

>9

≤40

Building,coating

XYF-1-1

≥0.65

10-40

10-12

≤10

detergent

 

5.FAQ

1)How many tons does your factory  can supply each moth?

  30000tons/month

2)How to quarantee the quality of the products?

  you can arrange SGS&BV or other quality inspection.

3)How many days you need to pepare the cargo after we made the order?

  within 30 days.