Loading Port:Tianjin
Payment Terms:TT OR LC
Min Order Qty:10000 pc
Supply Capability:10000 pc/month
Size: | 500mm 1000mm 2000mm 3000mm etc | Material: | Q235 Q345 | Surface Treatment: | H.D.G , Powder Coated , Painted |
Thickness: | 3.25mm | Diameter: | 48.3mm | Key Word: | cuplock scaffolding |
Lead Time: | 3-4 Weeks |
OME: | Offered |
Packaging Detail: | 100pcs per bundle with strengthen strap |
Delivery Detail: | within 30 days after receiving your deposit |
cuplock scaffolding
1.Q235 Q345 Material
2.Diameter 48.3mm
3.Wall Thickness: 3.0mm-3.5mm
4. Finish: HDG , powder Coated
Best Price Hot Dip Galvanized Cuplock Scaffolding On Sales
•Material: Q235 Q345
•Surface Finish: H.D.G Powder Coated Painted
•Standard : BS1139 EN74
• Diameter : 48.3mm
• Thickness: 3.25mm
• Standard : 500mm 1000mm 1500mm 2000mm 2500mm 3000mm 4000mm
• Ledger : 600mm 900mm 1000mm 1200mm 1250mm 1300mm 1500mm 1800mm 2000mm 2500mm
• Intermediate Transom: 565mm 795mm 1300mm 1800mm
• Hold Up Bracket: 291mm 565mm 795mm
• Packaging Way: 100pcs per bundle with strengthen strap
• Delivery time:3-4 Weeks From Production Date
• Minimum order: 1*20'Cintainer
• Supply ability: 1,200 Tons/ Month
No | Item | Data |
1 | Brand | |
2 | Model | |
3 | Material | Q235 Q345 |
4 | Finish | Hot Dipped Galvanized/ Powder Coated/ Painted |
5 | Dia( Φ) | 48.3mm |
6 | Thickness | 3.0-3.5mm |
7 | Standard | BS1139 EN74 |
8 | Components | Standard (Vertical) , Ledger , Transom, Brace , Bracket |
9 | Lead Time | 3-4 Weeks |
10 | OME | Available |