Loading Port:China Main Port
Payment Terms:TT OR LC
Min Order Qty:-
Supply Capability:-
Material: | Surface treatment: | Color: | |||
Technique: | Height: | Diameter: | |||
Thickness: | Type: | Application: | |||
Certification: |
Packaging Detail: | Cuplock scaffolding is in bare package, loading in the container. A 20 GP container can load 26 tons of cuplock scaffolding. |
Delivery Detail: | 10-20 days after deposit |
Cuplock Scaffolding
1.Scaffolding for building construction
2.Heavy duty scaffolding
3.CO2 arc welded
4.Good performance
Specifications of Best Price Cuplock Scaffolding for Building Construction
Name | Cuplock Scaffolding |
Size (more customized size available) | Standard(mm) | Ledger(mm) | Diameter | Thickness(mm) |
3000 | 2500 | 48 | 2.75/3/3.2 | |
2500 | 1800 | 48 | 2.75/3/3.2 | |
2000 | 1200 | 48 | 2.75/3/3.2 | |
1500 | 900 | 48 | 2.75/3/3.2 | |
1000 | 600 | 48 | 2.75/3/3.2 | |
Material | Q235 carbon steel | |||
Surface treatment | Hot Dip Galvanized(HDG); cold galvanized; powder coated; dip painted | |||
Color | Orange, dark red, blue, or as you required | |||
Welding technique | CO2 arc Welding | |||
Certification | SGS;EN12810 | |||
MOQ(Minimum Order Quantity) | 1 20ft container | |||
Payment | T/T | |||
Delivery time | 20days after deposit | |||
Package | Without outer packing or as you required | |||
Production capacity | 100 tons for each day |