Loading Port:Shanghai
Payment Terms:TT OR LC
Min Order Qty:1 m²
Supply Capability:10000000 m²/month
1. Structure of Cantilever Formwork Description
Cantilever Formwork is mainly used in the concrete pouring of pier, high buildings, and so on. The concrete lateral pressure is entirely supported by anchor system and the wall-through tie-rods, additional reinforcement is not needed. The construction is easy, rapid and economical. A single pouring height is high and the finished concrete surface is perfect. Cantilever formwork has several types, the structure is similar, and has its own different characteristic. Can use them according to actual demand.
Main cantilever Formwork:PJ200 & PJ240,CB-240 etc.
2. Main Features of Cantilever Formwork
-easy to assemble
-simple structure.
-easy, rapid and economical.
3. Cantilever Formwork Images
4. Cantilever Formwork Specifications
Anchor system
Anchor system is the most important supporting part. The system is made of five parts shown below. There into, tensile bolt, anchor shoe and bowl-climbing cone can be taken out for reusing after the concrete pouring.
① Tensile bolt M30/L= 110
② Anchor shoe
③ Bowl-climbing cone M30/D15
④ High-strength rod D15
⑤Ancor plate D15
5.FAQ of Cantilever Formwork
1) What can we do for you?
.We can ensure the quality of the Cantilever Formwork and avoid extra expenses for customers.
.We can provide you the professional technical team.
.We can provide professional building proposal for your projects.
. Please feel free to customize.
2) What promises can be done by us?
. If interested in this kind of formwork, please feel free to write us for any QUOTE.
. If need any technical and building assistance, we could provide on-site professional staff for instruction.
. Please DO check goods when courier knocks your door and contact us asap if any issueS.
3) What about of our after-sale services?
. Response will be carried out in 24hours after receiving any complain or request.
. Any formwork cost can be refund after order is confirmed.
. If the products are not based on the requirements, there will be the relevant compensations made for you.
4) What about the package and shipping time?
.Packing: wood package and adhesive tape
.Shipping: by sea
Shipping time: Normally small orders, it just1week business days to arrive your hand; When comes to the customs declaration, it may need 2weeks.
Concrete Formwork Aluminum Climbing System Advantages
1. Improve productivity and minimize labour
2. Reduce construction cycle tiem
3. Less wastage of plywood
4. High recovery value for the used materials
5. No nails needed
6. Since the whole system lifting, no small parts loss
7. Materials versatile
8. Easy and Fast operation
Manufacturing Procedure
1. Gather up metal scarps and melt them in the furnace.
2. The melted metal scraps become billets after the processing.
3. The prepared billets are cut into appropriate dimension.
4. The billets will be shaped differently by various types of moulds.
5. When a billet goes through a designated mould, a product will be extruded.
6. The extruded products will be cut into the right sizes.
7. Some products will be punched to make fastening holes.
8. Some products require additional welding works.
9. Finalized products will be coated with release with release agent.