Loading Port:Tianjin
Payment Terms:TT OR LC
Min Order Qty:5 set
Supply Capability:10000 set/month
Place of Origin: | Beijing, China (Mainland) |
Brand Name: | ZULIN |
Model Number: | ZPM-100 |
Certification: | ISO9001-2008 |
Minimum Order Quantity: | One 20ft container |
Price: | Negotiate |
Packaging Details: | in bulk ,pallet ,bundle or according the customer demand |
Delivery Time: | after deposit 15-20 days |
Payment Terms: | T/T L/C (bank transfer) |
Supply Ability: | 100sets/day |
Descrition:
Introduction
The lifting power of Auto-climbing Formwork System ZPM-100 comes from the hydraulic system, which includes the oil cylinder and commutator. The steel rail and the bracket can climb alternately, and therefore the whole formwork system climbs steadily. Cranes are not needed during the construction. It’s easy to operate,highly active and safe. It’s the best choice for construction of high buildings and towers.
ZPM-100 Structure Sketch
The Characteristics
1 The system is able to climb as a whole or individually, and in a stable way.
2 As the system climbs by itself and cleaning work is done in situ, tower crane lifts are greatly reduced.
3 It’s safe and convenient to operate, and labor and material costs will be greatly slashed.
4 The bracket will not come back to the ground until the construction is finished. Field spacing will be reduced and the bumping damages can be almost prevented, especially for the panels.
5 The climbing process is steady, synchronous and safe.
6 All-purpose platforms are provided, and there is no need to set up additional operation platforms, which means saving the labor and material costs again.
7 There is little margin for error. And if there is, it is simple and easy to correct. Deviations of construction work can be eliminated floor by floor.
8 Fast climbing speed can be achieved, and the construction cycle will be maintained according to schedule.