Loading Port:Qingdao
Payment Terms:TT OR LC
Min Order Qty:1 m.t
Supply Capability:1 m.t/month
LB800 Asphalt Mixing Plant with capacity 64t/h
Item | Description | Qty. (set) |
01 | Cold Aggregate Batching Machine and Feeders Group of four components, unit capacity of the aggregate hopper is 5M³ (full hopper), total capacity is 20M³; Adopts imported variable-frequency governor Continuous dosing belt & and driving reduction motor group, group of 4 units; The electric vibrato: 2 units | 1 |
02 | Feeding belt conveyor | 1 |
03 | The Drying Drum Ø1450×6300 MM, rotating speed: 11.3 RPM; Cylinder on frame, Rotation drive through electric motor and reduction box, The heat-preservation is 50mm rack wool and stainless steel | 1 |
04 | EBICO Gas burners Fuel :Natural gas | 1 |
05 | Cyclone dust collector |
|
06 | Bag dust collector |
|
07 | The hot aggregate elevator: capacity 80 T/H | 1 |
08 | The filler bin: 0.6 M³, the capacity of the filler elevator: 25T/H | 1 |
08 | The vibrating screen unit 4 grades, capacity 80T/H | 1 |
09 | The hot aggregate storage bin 4 numbers, the total volume is 10 M³, 4 units level indicator, temperature detector | 1 |
10 | The weighing devices The weighing unit for powder, aggregate and bitumen (each has one unit) | 1 |
11 | The mixing tower The main tower with supporting legs, repairing platform and guardrail | 1 |
12 | The mixer Capacity: 800 KG/batch, the motor power: 30KW | 1 |
13 | Vibration screen |
|
14 | Asphalt supply system and heating system 2 units 25 tons bitumen tank with hot oil heating system |
|
15 | Pneumatic control system | 1 |
16 | Electric control system |
|
17 | Control room |
|
18 | With 30ton bottom-set finished mixture storage tank | 1 |