Loading Port:Lianyungang
Payment Terms:TT OR LC
Min Order Qty:1000 m²
Supply Capability:200000 m²/month
Specifications:
Product name | Artificial Grass Turf |
Brand | CNBM |
Application | Landscape, garden,playgroud,leisure yard and etc |
Material | Anti-UV PE+PP |
Pile height | 35mm |
Yarn Danier | 13200D |
Gauge | 3/8" |
Stitches Rate | 200s/m |
Turf Denstiy | 21000s/sqm |
Primary Backing | Anti-aged PP Basic Cloth |
Secondary Backing | Anti-aged PP Non-woven Cloth or Anti-aged PP net Cloth |
Coating | Standard SBR Latex or PU |
Turf Weight | 2990g/sqm(+-1%) |
Drainage | 80 It/m2/min |
Package | Rooled in bag |
Roll Width | 2m,4m or customized |
Roll Length | 25m,30m or customized |
Loading QTY | about 2500sqm/20ft GP |
Product Show:
Description:
1.It can be frequently used with consistent performance for a long time, which greatly improves the efficiency of space;
2.Simulate the natural turf, comparable with the natural grass;
3.High wear resistance and high environment protection performance;
4.Good air permeability and drainage performance;
5.Good elasticity, which can effectively helps the players to injury motion
Certificate:
Installation and Maintenance:
1.check the entire lawn site needs to be laid, whether the basic density and smoothness meet the requirements, cleaning the site sanitation.
2.paving artificial lawn, in order to make the lawn fold natural expansion, it is recommended to put artificial lawn in the sun, half a day best, at this time should pay attention to the direction of the lodging of the lawn.
3.began laying artificial lawn: in the lawn joint surface of the pavement on the special splicing belt, and with glue fixed on it, the joint area need to transfer more than 10 cm overlap.
4.Apply glue to the bonding surface. Before the drying of the glue, trim the lawn to be tiled and joined, allowing each artificial lawn to bond tightly.
5.with a knife to cut the lawn of the black edge, mowing the lawn seam.
FAQ:
Q:What is your terms of payment?
A: Usually, it is T/T 30% as deposit, and 70% before delivery. L/C, Paypal, Western Union all OK. We'll show you the photos of the products and packages before you pay the balance.
Q:What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU, DDP.
Q:How about your delivery time?
A: Generally, it will take about 7 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q:Can you produce according to the samples?
A: Yes, we can produce by your samples.