Aluminum Formwork with Economic Design Principle

Loading Port:Shanghai

Payment Terms:TT or LC

Min Order Qty:100 m²

Supply Capability:8888888888888888888888 m²/month

Product Description:

Environment Friendly of Aluminum Formwork

All the material adopted by aluminum formwork system are reproducible and meet China national standard for energy saving. Timber beam formwork is forbidden to use by many developed countries and recycling formwork system are encouraged; thus, aluminum formwork system benefits not only the economic effect but also the social effect.   

 

 

 

 

 

No.

Item

Aluminum Formwork

Timber Beam Formwork

1

Panel material

Aluminum panel with 4mm thickness

Plywood with 20mm thickness

2

Formwork weight(kg)

Medium

Medium

3

Bearing capacity(KN/m2)

60

30

4

Construction period

4~5 days per floor

At least 6 days per floor

5

Formwork dismantling period

Colum & wall formwork are dismantled after 24 hours; slab formwork is dismantled after 36 hours

slab formwork is dismantled at least after 168 hours

6

Construction condition

Easy

Hard

7

Maintenance cost

Low

High

8

Construction efficiency

High

Low

9

Application scope

Wall, column, beam, slab and bridge

Wall, column, beam, slab and bridge

The technology index comparison between Aluminum Formwork and Timber Beam Formwork

 

No.

Item

Aluminum Formwork

Timber Beam Formwork

1

Surface effect I

Flat, smooth and accurate

Rough

2

Surface effect II

No stick concrete

Stick concrete

3

Window molding & installation

Accurate and could be installed from down side to up side

Deviation and could be installed only after sand-plastering

4

Lifting equipment outside frame

No need

Need

5

Requirement for

6

Concrete leakage

No leakage

Leakage and need re-cleaning

7

Construction garbage

Few

Lots

8

Construction change cost

Low

High

9

Requirement for concrete grade and steel bar

High

Low

10

Requirement for construction workers

High and professional

Need less workers

Low and unprofessional

Need more workers

 

The economic index comparison between Aluminum Formwork and Timber Beam Formwork in China

No.

Item

Aluminum Formwork Construction

Timber Beam Formwork Construction

1

Formwork cost

USD5/ (Rental price)

USD3/

2

Labor cost for assembling, dismantle and transportation

USD4.3/

USD4.6/

3

Formwork support frame, fasten material

0

USD0.85/

4

Lifting equipment usage

0

One day per floor

5

Worker cost for sand-plastering

Decreased by 70%

USD1.4/

6

Cost for sand-plastering

Decreased by 80%

USD0.67/

7

Formwork leakage

None

Controlled by worker

8

Procession quality control

One technician / day

Two technician / day

9

Auxiliary Mini machinery (including bench saw)

None

Required

10

Power supply cost for formwork assembling & transportation

None

Required

11

Loading platform for formwork transportation

None

Four units / floor

China National Building Material Group Co., Ltd. (CNBM) was founded through the merger of the China National Building Materials Group Corporation and China National Materials Group Corporation.

Having integrated its scientific research, manufacturing and logistics, CNBM is the largest manufacturer for building materials and an integrated service provider leading throughout the world. It has been listed in the Fortune Global 500 for nine consecutive years.

Total assets 600 billion yuan

Employees world +200,000

Sales 300 billion yuan

The largest comprehensive building materials industry group in the world:

ü The Group can produce 400 million tons of cement clinker, 460 million m3 of ready-mix concrete, 2.47 billion m2 of plasterboard, 2.5 million tons of fiberglass, 31,500 pieces of GW-capacity wind turbine blades, ranking No.1 in the world.

ü The No. 1 player in the international cement engineering market and international cogeneration market.

ü CNBM is the largest ultra-high voltage electrical porcelain producer, fused cast refractory producer, ultra-thin electronic float glass producer, carbon fiber producer in China.

ü CNBM takes possession of 26 national scientific research and design institutes, 38,000 scientific R&D and technical engineering employees, 33 national industrial quality inspection centers, more than 10,000 patents, 3 national key laboratories, 8 national engineering (technology) research centers and 18 national standardization technical committees.