Aluminum Formwork system with Scaffolding Support System

Loading Port:Tianjin

Payment Terms:TT or LC

Min Order Qty:50 m²

Supply Capability:1000 m²/month

Product Description:

1.Structure of Aluminum Formwork System

Formwork is the term given to either temporary or permanent molds into which concrete or similar materials are poured.

In the context of concrete construction, the falsework supports the shuttering moulds.

 

2. Main Features of Aluminum Formwork System

◆ Lighter weight but high bearing capacity.

◆ Manual transportation can be achieved, greatly reduces the aggregate cost.

◆ Perfect design, excellent produce and well welding make sure the flatness of concrete

surface.

◆ It is with the advantages of standard design, excellent applicability and interchangeable.

◆ Simple, safe and fast.

◆ No rust corrosion, easy maintenance, and high turnover rate.

◆ The formwork series are a complete system with a full set of accessories, and can be

set up flexibly according to project.

 

3.Aluminum Formwork Images

 

 

 

4.Aluminum Formwork Specification

Aluminum Formwork system with Scaffolding Support System

 

5. FAQ of Aluminum Formwork System

1)What promises can be done by us?

If interested in Aluminum Formwork, please feel free to write us for any QUOTE. If printing required, please advise asap because the whole set need much more time to complete. Please DO check goods when courier knocks your door and contact us asap if any issue.

2) What about of our after-sale service?

Response will be carried out in 24hours  after receiving any complain or request.

Aluminum Formwork cost can be refund after order is confirmed. 

If the products are not based on the requirements, there will be the relevant compensations made for you.  

3) What about the package and shipping time?

Packing:  As Customer's Requirements

Shipping: We have various shipping ways for our customers, such as express which including TNT,  DHL,  FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.  

Shipping time:

Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. Other mass qty of Aluminum Formwork, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days.