aluminum formwork for build

Loading Port:China Main Port

Payment Terms:TT OR LC

Min Order Qty:-

Supply Capability:-

Product Description:

Aluminum alloy of early dismantling template system with performance,

complete system of wall, beam, top overall pouring, normal labor four

days a, short construction period, save the construction unit of the

construction management cost greatly.

The construction is convenient, high efficiency, aluminum alloy

template light weight, large area assembly is convenient, the

average weight of 20~25kg/ square metres. Is entirely artificial

assembly, no need of mechanical equipment.


Aluminum alloy template can be used repeatedly, the average usage

cost is low. Aluminum alloy extrusion profile template system uses

as a skeleton, a set of template construction specification can be

used more than 300 times.