Loading Port:Qingdao
Payment Terms:TT OR LC
Min Order Qty:500 set
Supply Capability:10000 set/month
Aluminium Alloy Wheel for Best Pormance No. 103
Product Description:
Aluminium Alloy Wheel for Best Performance No.103
Structure of Aluminum Alloy Wheel Description:
Aluminum alloy wheel is designed for automobile, a barrel shaped metal parts used to support the tyres within the tire profile. The original factory wheel hub on the market can be divided into steel wheel hub and alloy wheel which depends on the material. Compared with the former, the later have more advantages. Aluminum alloy wheel is an excellent representative of alloy wheel.
2. Aluminum Alloy Wheel Production Procedure Machinies as following:
• Casting Machine Melting & Full Heat Treatment
• CNC machine CNC made in Taiwan
• Painting Line Full automatic Painting
3. Aluminum Alloy Wheel No.103 images:
4.Aluminum Alloy Wheel No.103 Specification & Advantages:
Specification:
Size | ET | CB | Hole | P.C.D | Finish | Weight(kg) | Mould Time |
15X7 | 25/40/42 | 73.1 | 5/4 | 100/108/114.3 | BLACK | 0/7.8/7.9 | 2008.8.13 |
Advantages:
• Lighter than tube wheels
• Better cooling performance in longdistance and high speed driving
• High speed lowering tyre termperature can reduce wear resistance prevent tyre-shoulder seperation
4. FAQ
For servicing you well, we here attached some common questions for your review, please do not hesitate to contact us if any questions:
①How do you control your aluminium alloy wheel quality?
We have established the international advanced quality management system,every link from raw material to final product we have strict quality test as following:
Quality Control Certifications : JWL.VIA Japanese Standard
Impact fatigue testing
Bending fatigue testing
Radial run out testing
Dynamic balance testing
Air-tightness testing
② How long can we receive the product after purchase?
In the purchase of product within 3 working days, We will arrange the factory delivery as soon as possible. The specific time of receiving is related to the state and position of customers’ requirement as commonly 7 to 10 working days can be served.