Aluminium Alloy for Great Performance No. 1

Loading Port:Shanghai

Payment Terms:TT OR LC

Min Order Qty:500 set

Supply Capability:10000 set/month

Product Description:

 

Aluminium Alloy Wheel for Great Pormance No. 1

 

Product Description:
 

Aluminium Alloy Wheel for Great Performance No.1

 

1. Structure of Aluminum Alloy Wheel Description:

Aluminum alloy wheel is special for cars and trucks & buses, they are a barrel shaped metal parts used to support the tyres within the tire profile. The original factory wheel hub on the market can be divided into steel wheel hub and alloy wheel according to the material differences. Compared with the former, the latter have more advantages than the former ones. Aluminum alloy wheel is an excellent representative of alloy wheel according to their following characters:

 

2. Aluminum Alloy Wheel Production Procedure:

With Casting Machine Melting & Full Heat Treatment

With CNC machine CNC made in Taiwan

WIth Painting Line Full automatic Painting


3. Aluminum Alloy Wheel No.1 Images:

 

Aluminium Alloy for Great Performance No. 1

Aluminium Alloy for Great Performance No. 1

Aluminium Alloy for Great Performance No. 1

 

4. Aluminum Alloy Wheel No.1 Specifications & Advantage:

 

Specifications:

 

Size ETCBHoleP.C.DFinish
17X7.53554.1-74.14/5100-120.65BLACK 
18X83854.1-74.14/5100-120.65BLACK 

 

Advantage:

 

It is Lighter than tube wheels

It has Better cooling performance in longdistance and high speed driving

It is Bigger external diameter

It gets High speed lowering tyre termperature can reduce wear resistance prevent tyre-shoulder seperation


4. FAQ

We have organized several common questions for our clients,may help you to choose the favourate aluminium alloy wheels for your consideration:

① How do you control your aluminium alloy wheel quality?

We have established the international advanced quality management system,every link from raw material to final product we have strict quality test as following:

Quality Control Certifications as JWL.VIA Japanese Standard

 With Impact fatigue testing

 With Bending fatigue testing

 With Radial run out testing

 With Dynamic balance testing

 With Air-tightness testing


② How long can we receive the product after purchase?

In the purchase of product within 3 working days, We will arrange the factory delivery as soon as possible. The specific time of receiving is related to the state and position of customers’ requirement as commonly 7 to 10 working days can be served. If the order is huge, we will arrange the new production lines specially for our customers. Please do not hesitate to contact us if any questions and we are looking forward to hearing the news from all of you.