Alloy Steel Spread Anchor for Concrete Construction

Loading Port:Tianjin

Payment Terms:TT OR LC

Min Order Qty:100 pc

Supply Capability:10000 pc/month

Product Description:

Spread anchor for concrete construction

1.Product details:

1) Material: steel
2) Specification: 1.3T, 2.5T (2T), 5.0T (4T), 10.0T (8T) 
3) Products available: swift lift lifting eyes are used with the swift lift anchors to lift, handle and place precast concrete elements

2.Primary competitive advantages:

1)We can supply guarantee/warranty
2)On-time delivery time within 25 days after confirming order
3)Products are enhanced by the factory QA and Quality Control checks during the production, if necessary each order can be send out with a certificate referring back to test
4)Precast concrete elements may be lifted several times after casting and during storage and erection-by using this system the designer and the worker manager ensure that each lift is carried out safely and quickly, failure to use a designed and coordinated system could result in material breakage at some point during the production/delivery process

3.Kindly note:

1)All anchors and lifting links must be designed, calculated and installed according to the instruction, details please ask us
2)The system is only suitable for pre-casting, storing and erecting precast elements
3)For long term use, such as counter weights, please consult Halfen
The lifting link must be in a secure position during the lifting operation
4)This literature is guidance for professional engineers/pre-casters, if in doubt, please ask


Market:

Asia

Australasia

Central/South America

Mid East/Africa

North America

Western Europe


FAQ:
 
Q1: How long about delivery time  Concrete transport socket  ?
A1: The delivery time will be very short, normally we keep the raw materials for old customers and sometime we 
also keep stock products to 

make sure delivery time in any emergency cases.

Q2: How do we guarantee the quality of our  Concrete transport socket ?
A2: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. At the same time, we provide extensive follow-up service assurances as required.
Q3: How soon can we receive the product after purchase?
A3: Within three days of placing an order, we will book the vessel for goods. The specific shipping date is dependent upon international and government factors, but is typically 7 to 30 workdays.
 

Alloy Steel Spread Anchor for Concrete Construction

Alloy Steel Spread Anchor for Concrete Construction