50W UL Led Spot Light

Loading Port:Shanghai

Payment Terms:TT OR LC

Min Order Qty:1 pc

Supply Capability:20000 pc/month

Product Description:

 1. Features

-Aluminum alloy ADC12, Fine sand oxidation surface, bright silver/black.Nice appearance and long service life.
-Use  unique  heat-dissipating  design  and thermal  conductivity  aluminum as heat-dissipating material to ensure the high heat-dissipating performance.
-60% energy-saving compared with traditional lights.
-Professional optical design ensure the high light efficiency.
-Use fog lens to eliminate the glare.
-Beam angle:45°.
-Long life span up to 30,000 hours.
-Fully compliant with RoHS and CE standard.

Technical Parameter of the PAR30
-Input Voltage:  100-240V AC;50/60Hz.
-Max Current:   0.12A
-LED type: 5730 LED 
-LED Number:24 pieces
-Output Power: 12W
-Shell color: oxidation bright silver, oxidation black

-Use environment: -20 °C to 45 °C 
-Net weight: 0.218KG
-Gross weight: 0.3KG
-White box size: 115 * 115 *130mm

-Package size: 485 * 485 * 315mm (32PCS per box)

Main Applications of the PAR30
-Hotel, super market, meeting rom and reception desk lighting;
-Forum, fair, and hall lighting;
-Advertisement, cabinet and cupboard lighting;
-Home use lighting.

 

2. Specifications

50W UL Led Spot Light

 

3.Dimensions

50W UL Led Spot Light

 

4. Production of Flowsheet

.png

 

5. Images

 

50W UL Led Spot Light

50W UL Led Spot Light

50W UL Led Spot Light

 

 

6. FAQ

 

We have organized several common questions for our clients,may help you sincerely:

①How about your company?

A world class manufacturer & supplier of castings forging in carbon steel and alloy steel,is one of the large-scale professional investment casting production bases in China,consisting of both casting foundry forging and machining factory. Annually more than 8000 tons Precision casting and forging parts are exported to markets in Europe,America and Japan. OEM casting and forging service available according to customers requirements.

②How to guarantee the quality of the products?

We have established the international advanced quality management system,every link from raw material to final product we have strict quality test;We resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.

③How long can we receive the product after purchase?

In the purchase of product within three working days, We will arrange the factory delivery as soon as possible. The pecific time of receiving is related to the state and position of customers.Commonly 7 to 10 working days can be served.