1 2 Inch Plastic Pipe Fittings - 2024 User-Friendly PPR Pipe for Water Conveyance Made in China

Loading Port:Qingdao

Payment Terms:TT OR LC

Min Order Qty:200 pc

Supply Capability:1000000 pc/month

Product Description:

Product Overview

Material: 100% virgin PP-R                 

Size: 20mm-110mm

Certificate: CE Certificate

Standard: GB/T18742.2-2002; DIN8077/8078

Working place: -20°-95°


.jpg


Application

Distribution for cool and hot water;

Duct for drinkable water system;

Pipes for kinds of high-temperature and low-temperature heating system;

Pipes for heating and cooling settings in solar energy system;

Connecting pipe for air conditioners


Product Description

Pressure

Size(mm)

Pressure

Size(mm)

 

 

 

 

PN1.25MPA

20*2.0

 

 

 

 

PN1.6MPA

20*2.3

32*2.9

32*3.6

40*3.7

40*4.5

50*4.6

50*5.6

90*8.2

90*10.1

110*10.0

110*12.3


Shipment/Payment

Packing: 5.8m/11.8m each piece. 50m/100m/150m/200m for small sizes pipes.

Loading port: China port(Chongqing port, Shanghai port, Tianjin port)

Price term we offer: FOB,CIF,CFR

Payment: L/C and T/T


Product Show

2018 User-friendly Ppr Pipe for Water Convanyance Made in China

2018 User-friendly Ppr Pipe for Water Convanyance Made in China


Our Services

Pre-Sales Service

1. Inquiry and consulting support. 

2. Sample testing support. 

After-Sales Service

1. Training how to instal the machine, training how to use the machine. 

2. Engineers available to service machinery overseas.


FAQ

Are you trader company or Manufacturer?

We are comprehensive plastic processing enterprises specializing in the production of PPR pipe, Steel wire reinforced PPR pipe, PPR pipe fittings and welding machines.

 

What about your payment terms?

Normally T/T or irrevocable L/C at sight.

 

What about your Free samples?

Samples are available free, all customers shall pay the sample's shipping cost.

 

What about your MOQ and deliver time?

The MOQ can be discussed. Normally is one container. Normally 3-15 days, if the quantity is big enough, the delivery time will be longer. It is negotiable