2024 ABS Plastic Pipe Fittings PPR Orbital Ball Valve for Industrial Fields in China with Durable Quality

Loading Port:Tianjin

Payment Terms:TT OR LC

Min Order Qty:100 pc

Supply Capability:1000000 pc/month

Product Description:

Product Overview

1) Cold / hot water supply facilities for public buildings 
2) Food, chemical, electronic industry pipeline networks; Such as Pipeline networks for transporting all kinds of    corrosive liquids 
3) Drinking water production system pipeline networks; Such as Pure water and mineral water 
4) Air conditioning facility pipelines 
5) Compressed gas pipeline networks for industry 
6) Pipeline networks for swimming pools 
7) Pipeline networks for solar energy facilities 
8) Agriculture and garden production transporting systems


Application

Distribution for cool and hot water;

Duct for drinkable water system;

Pipes for kinds of high-temperature and low-temperature heating system;

Pipes for heating and cooling settings in solar energy system;

Connecting pipe for air conditioners


Product Description

Pressure

Size(mm)

Pressure

Size(mm)

 

 

 

 

PN1.25MPA

20*2.0

 

 

 

 

PN1.6MPA

20*2.3

32*2.9

32*3.6

40*3.7

40*4.5

50*4.6

50*5.6

90*8.2

90*10.1

110*10.0

110*12.3


Quick Details

Material: PP-R, PPR

Technics: injection

Type: pipe

Place of Origin: China (Mainland)

Model Number: 20-110MM

Connection: Welding

Shape: Equal

Head Code: round

Product Type: Ppr pipe

Color: white, grey, green


Delivery time:

1.As usually, we need 20 days to 45 days.

2.By the way ,we can control our delivery time and products' quality.

3.It depends on our destination and order. Generally, it will be shipped to our destination within 50days,we will arrange everything timely after receiving our deposit.



Product Show

2018 PPR Orbital Ball Valve Used in Industrial Fields in China with Durable Quality

2018 PPR Orbital Ball Valve Used in Industrial Fields in China with Durable Quality


Our Services

Pre-Sales Service

1. Inquiry and consulting support. 

2. Sample testing support. 

After-Sales Service

1. Training how to instal the machine, training how to use the machine. 

2. Engineers available to service machinery overseas.


FAQ


Q: What you offer?

A: Any kinds of goods you need, just send us the request, we will reply you back with the details very soon.

 

Q: Product quality and delivery time?

A: Normally 7-15 days after the order confirmed, we will collect the goods and inspect each of the items and send you the inspection photos for you to confirm.

 

Q: What's the regular shipping port?

A: Ningbo, Shanghai.

 

Q: What's your payment?

A: T/T or L/C at sight