2024 New PPR Plastic Tubes for House Use with PPR Materials

Loading Port:Tianjin

Payment Terms:TT OR LC

Min Order Qty:200 pc

Supply Capability:10000 pc/month

Product Description:

 Introduction:

The comprehensive technical performance and economic indicator of PP-R are much better than galvanized pipe, UPVC pipe, polyethylene-aluminum compound pipe, PE-X (cross-linked polyethylene) and polybutylene pipe etc. For this reason PP-R is the leading products and widely used for feed-water piping in developed countries in Europe and America.

Nowadays PPR pipes win more attention and have been used all over the whole world more widely with its excellent sanitization performance, high heat resistance, compression resistance, corrosion resistance, pliability and seismic performance which make PP-R the real environmental friendly pipe.



Application:

1) Cold and hot water systems of residence and commercial buildings

2) Transportation of industrial water supply and chemical materials

3) Transportation system of drinking water production

4) Piping networks for solar plants



Our Services:

MOQ

FCL, 25 metric tons per   20GP, can be assorted with different sizes.

LCL for trial order is   acceptable.

Price Term

EX-WORK, FOB China Port,   CNF, CIF

Payment

T/T,D/A,D/P, 30% advanced   payment before production and balance before shipment;   OR Irrevocable L/C at sight.

Delivery Time

within 30 days of receipt of   LC original or prepayment



Main Features:

Large drum hub to maximize cable life

Self-activating automatic brake hold the load securely when crank handle is released

With cable or strap

Safety guard cover available

Widely used in the double beam bridge crane and gantry crane

Compact structure and reasonable design



Product Description:

Pressure

Size(mm)

Pressure

Size(mm)

 

 

 

 

PN1.25MPA

20*2.0

 

 

 

 

PN1.6MPA

20*2.3

25*2.3

25*2.8

32*2.9

32*3.6

40*3.7

40*4.5

50*4.6

50*5.6

63*5.8

63*7.1

75*6.8

75*8.4

90*8.2

90*10.1

110*10.0

110*12.3



Product Show:

2017 New PPR Pipe House Used with Ppr Materials

2017 New PPR Pipe House Used with Ppr Materials

2017 New PPR Pipe House Used with Ppr Materials



FAQ

Q: How do you guarantee the quality of your product?

A: Every process will be checked by responsible QC which insures every product's quality.

 

Q: How much is your delivery time?

A: Normally within 30 days of receipt of LC original or prepayment, but mostly according to the specific requirements or the quantity

 

Q: I need sample, could you support?

A: We can supply you with the sample for free, but the delivery charges will be covered by our customers. For avoiding the misunderstanding, it is appreciated if you can provide the International Express Account for Freight Collect. Also you can have a visit to us, welcome to CNBM!