Loading Port:Jiangmen
Payment Terms:T/T
Min Order Qty:100 Pieces pc
Supply Capability:50000 Pieces per Day pc/month
2014 year fresh product high quality 12W China factory excellent rotation led track spot light, LED Down Light, downlighting, led downlight, cob downlight
Specification:
product name | 12W LEDTrack Light | |||
Model Number | LBT-TL-12WJ-WW | LBT-TL-12WJ-NW | LBT-TL-12WJ-CW | Units |
CCT(°K) | 3000K±10% | 4000K±10% | 6500K±10% | K |
Light Source | 12PCS 1W (high power) | W | ||
Input Voltage | AC 100~240 V | V | ||
Input Frequency | 50~60 Hz | Hz | ||
Power Factor | >0.93 | --- | ||
Power Consumption | Typical:12W Maximum:13W | W | ||
LED Operating Voltage | DC 28V | V | ||
LED Operating Current | 0.6A | A | ||
LED Luminous Flux (lm) | 900 lm±40 lm | 1000 lm±40 lm | lm | |
CRI | Ra>80 | Ra>70 | % | |
Operating Temperature | -20°C ~ 45°C | °C | ||
Housing Temperature | <=60°C | °C | ||
Operating Humidity | <85% Non condensed | % | ||
MTBF(1) | >30,000Hr | Hr |
Application:
1. Jewelry counter lighting;
2. Commercial lighting;
3. Display case accent;
4. Artwork lighting;
5. Restaurant, hotel, office, hospital ect.
Custominzing Options
Accept OEM/ODM, print your logo on products.
Packing
Standard packing or customized packing.
Cartons outside.
Delivery:
Shipping Service | Estimated Delivery Time |
DHL | 2-8 business days |
FedEx | 3-8 business days |
TNT | 2-10 business days |
UPS | 1-7 business days |
EMS | 6-14 business days |
ePacket | 7-12 business days |
China Post Air Mail | 7-15 business days |
China Post SAL | 14-30 business days |
Air freight | 3-10 business days |
By Sea | 30-40 business days |
1. 3-5 business days for Sample Orders; 7-30 business days for Bulk Orders for Bulk Orders.
2. "Business days" means Monday-Friday, excluding holidays.
3. DHL and UPS cannot ship to military or P.O. boxes address
4. The Shipping Service above is for reference only, for any other questions, please feel free to contact us.