2014 New Product!! 1.5M Japanese Led Light Tube 24W T8 For Cooler Box

Loading Port:Shenzhen

Payment Terms:L/C,T/T

Min Order Qty:5 Pieces pc

Supply Capability:100000 Pieces pc/month

Product Description:

High lumen 150cm japanese led light tube 24w t8 for cooler Specification:

Type No.

Length

Dia.

LED Qty

Watt

LED Type

Voltage

Lumen

GL-LI-S106

0.6m

30mm

108pcs

8W

SMD 3528

85-265VAC

800 lm±10%

GL-LI-S106

0.6m

30mm

144pcs

9W

SMD 3528

85-265VAC

900 lm±10%

GL-LI-S109

0.9m

30mm

180pcs

12W

SMD 3528

85-265VAC

1200 lm±10%

GL-LI-S112

1.2m

30mm

252pcs

18W

SMD 3528

85-265VAC

1800 lm±10%

GL-LI-S112

1.2m

30mm

288pcs

20W

SMD 3528

85-265VAC

2000 lm±10%

GL-LI-S112

1.2m

30mm

324pcs

22W

SMD 3528

85-265VAC

2200 lm±10%

GL-LI-S115

1.5m

30mm

360pcs

24W

SMD 3528

85-265VAC

2400 lm±10%

GL-LI-S118

1.8m

30mm

432pcs

28W

SMD 3528

85-265VAC

2800 lm±10%

GL-LI-S124

2.4m

30mm

576pcs

36W

SMD 3528

85-265VAC

3600 lm±10%

GL-LI-S124

2.4m

30mm

648pcs

40W

SMD 3528

85-265VAC

4000 lm±10%

 

 

LED light tube Features:

1. Patented design: Aluminum inner pipe + Full PC cover outside.

2. Reliable power supply, designed and produced by ourselves.

3. Wide voltage: 90-277VAC

4. CE, RoHS, FCC, UL, CUL, TUV, ITACS, PSE certified.

5. Low lumen depreciation. Almost "Zero" after 3000-hour continuous aging test.

6. Could be used directly with inductive ballast and starter.

7. Clear/Frosted cover available.

8. 0.6m/0.9m/1.2m/1.5m/1.8m/2.4m and customized size available.

9. Could replace T8/T10/T12 traditional fluorescent lamps.

10. Bi-pin, single pin or R17D lamp base available

 

 

LED Tube Light Applications:                                               

Widely applied in hotel , meeting room , offices , hospitals , schools , factories ,

shopping malls , supermarkets , kitchen, home indoor lighting and so on

application

 

 

Delivery:

Shipping Service

Estimated Delivery Time

DHL

2-8 business days

FedEx

3-8 business days

TNT

2-10 business days

UPS

1-7 business days

EMS

6-14 business days

ePacket

7-12 business days

China Post Air Mail

7-15 business days

China Post SAL

14-30 business days

Air freight

3-10 business days

By Sea

30-40 business days

1.    3-5 business days for Sample Orders; 7-30 business days for Bulk Orders for Bulk Orders.

2.    "Business days" means Monday-Friday, excluding holidays.

3.    DHL and UPS cannot ship to military or P.O. boxes address

4.    The Shipping Service above is for reference only, for any other questions, please feel free to contact us.

 

 

Factory:

Factory