WHOLE ALUMINUM FORMWORK FOR BUILDING CONSTRUCTIONs

Loading Port:Tianjin

Payment Terms:TT OR LC

Min Order Qty:100 m²

Supply Capability:10000000 m²/month

Product Description:

1. Introduction :

Aluminum Formwork System 
*Monolithic pouring 
*Concrete rate:4 days/floor 
*Easy to handle 
*Eco-friendly

 

2. Aluminum Formwork VS Timber Formwork

 

Item

Unit

Aluminum Formwork

Timber Formwork


cycle times

Times

150--300

6--8


Template sets

Set

1

3--4


Unit price(including spare parts)

RMB/Sq.M

1380--1500

100


Cost of labor for installation

23--25

25


Cost of auxiliary machinery

/

2


Residual value of formwork

300--400

/


High-rise of a building (30 floors)

34--38

43


High-rise of a building (40 floors)

26--29

43


High-rise of a building (50 floors)

21--23

43


Same house type for two buildings (30 floors)

17--19

43


Same house type for three buildings (30 floors)

11--13

43


Remarks:

1. It will be different ,due to its different price of   commodities and cost of labor in the locality .

2.Aluminum Formwork System contains all supporting,   waling,release agent etc which must be used under construction.



 

3. Advantage

1. Light weight, high strength

The data has proved that the flexural strength of aluminum is triple higher than ordinary steel.With weight of 20-25KG/M2. Aluminum formwork is the lightest formwork for construction,which makes for easy handling.

 

2. Various sizes, high accuracy

The construction drawing is designed with strict structure, with little measurement error and high accuracy,which is very suitable for high rise buildings.

 

3. Safe and convenient construction

High loading capacity requires less use of props, reducing lost in material and labor. Workers can independently operate after simple training. 

 

4. Long time used

With the lowest average lost, aluminum formworks can be used up to 300 times.

 

5. Wide range used

The precise-designed formwork system applies to all kinds of building elements, such as the main wall, column, beams, stairs and balconies.

 

6. Excellent quality

The concrete surface is very smooth, so it can saved the swing cost and shorten the construction period.

 

7. High efficiency

According to different climatic conditions, the formworks can be removed in 18-36 hours.

 

8. Recyclable value

The used aluminum material is of greater recyclable value,several times higher than steel.

 

9. Independent support system

The gap between the formwork support is totally enough for passing, moving and pulling.

 

10. Dependable safety, environmental

The construction process is totally safe. Full aluminum structure leads to no galvanization and thus minimizes the pollution to our earth.


 

4. Whole Aluminum Formwork Images

WHOLE ALUMINUM FORMWORK  FOR BUILDING CONSTRUCTIONs

WHOLE ALUMINUM FORMWORK  FOR BUILDING CONSTRUCTIONs

WHOLE ALUMINUM FORMWORK  FOR BUILDING CONSTRUCTIONs

WHOLE ALUMINUM FORMWORK  FOR BUILDING CONSTRUCTIONs

WHOLE ALUMINUM FORMWORK  FOR BUILDING CONSTRUCTIONs



4. FAQ of  Whole Aluminum Formwork

 

1) What can we do for you? 

    .We can ensure the quality of the Whole Aluminum Formwork and avoid extra expenses for customers.    

    .We can provide you the professional technical team.    

    .We can provide professional building proposal for your project.       

    . Please feel free to customize.  

 

2) What promises can be done by us?

   . If interested in this kind of formwork, please feel free to write us for any QUOTE.

   . If need any technical and building assistance, we could provide on-site professional staff for instruction.

   . Please DO check goods when courier knocks your door and contact us asap if any issueS.

 

3) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  

 

 4) What about the package and shipping time?

-Packing: wood package and adhesive tape

-Shipping: by sea

     -Shipping time: Normally small orders just takes 7 business days to arrive your hand;. When it comes to the customs declaration, it may need 2weeks.