Loading Port:China main port
Payment Terms:TT OR LC
Min Order Qty:30 m.t.
Supply Capability:100000 m.t./month
• Workability, durability
• Smooth and flat surface
• Excellent heat resistance performance
• Good formability
• High strength
• Excellent process capability
• Good visual effect
Standard: ASTM, GB,JIS,JIS G3302 ASTM 755 EN10169
Grade: DX51D CGCC CS
Chemical composition:
C | Si | Mn | Cr | Ni | P | S |
0.150 | 0.476 | 11.231 | 12.50 | 0.900 | 0.039 | 0.010
|
1. How long can we receive the product after purchase?
Usually within thirty working days after receiving buyer’s advance payment or LC. We will arrange the factory manufacturing as soon as possible. The cargo readiness usually takes 15-25 days, but the shipment will depend on the vessel situation.