SCP200 Mast Climbing Work Platform

Loading Port:Tianjin

Payment Terms:TT OR LC

Min Order Qty:-

Supply Capability:15 units unit/month

Product Description:

Rated Capacity

2000 kg, Double Mast

Maximum Length of Platform

25m

Width of Platform

1200 mm

Length of Platform Section

1500 mm

Length of basic platform Section

1080 mm

Length of extension platform

1000 mm

Extension tubes and floor included

Height

200 m

Lifting Speed

0-6 m/min, with frequency inverter, Toshiba Brand

Motor Power

2-2x2.2kw, SEW Motor + Reducer

Mast Section

Square 450mm × 450mm × 1508mm;

Square Tube 60 x 60mm,

Thickness 4mm & 6mm

Module = 8

Hot dip galvanized

Voltage

380-415 [V] - 50 -60 [Hz]

Centrifugal Safety Device Model

SAJ30-0.8

Noise Level

≤60 dB


SAFETYFEATURES

-Self braking motors (Magnetic braking).
- Hot-dip galvanized structural elements for a long duration.
- Double safety limit switches up and down
- Safety interlocks on access gates
- Audio travel alarm
- Base levelling screw jacks with safety locks
- Safety top mast section with interrupted rack
- Phase control and over charge electrical protection
- Twin mast automatic self levelling device
- Manual descent device when power failure
- Emergency Stop Button
- Overload Protection Device
- Emergency Centrifugal Safety Device