SBS/APP MODIFIED BITUMINOUS WATERPROOFING

Loading Port:China Main Port

Payment Terms:TT OR LC

Min Order Qty:-

Supply Capability:-

Product Description:

Packaging & Delivery

Packaging Details:

pallet

Delivery Detail:

in 15 days after receive the deposit

Specifications

SBS/App waterproof membrane
2.competitive price with high quality
3.Safe application, no pollution
4.Good impermeability

Polyester Base SBS/APP Waterproof Membrane

Item

Polyester Base SBS/APP Waterproof Membrane

Brand

Wanbao

Grade

First

Second

Base

PY

G

PYG

Cover

PE

S

M

PET

Thickness

2/2.5/3/3.5/4mm

Color

Black PE film

Yellow/Green/Red/Other Fine Sand

Grey/Green/Red/Other Mineral/Grains/Flakes

Aluminium Foil

Notes

PY------Polyester Base

G------Glassfibre Base

PYG------Glassfibre Reinforced Polyester Base

Characteristic
a)Good impermeability

b)SBS modified bitumen membrane is specially being applied in the cold area with low temperature
c)Good performance in anti-puncture, anti-broker, anti-resistance, anti-erosion, anti-mildew, anti-weathering

d)Possess good tensile strength, elongation rate and size stability which could be well suited the substrate distortion and crack

There are two methods in application
a) One way is by heating and melting method.Heat the polyethylene film of the membrane and roof deck surface by heating and melting method to be nearly melted (not flowing),then install the membrane filly bonded to the roof deck with overlaps of 5-10cm.
b) The other way is by cold adhesive method.Pour the cold adhesive homogeneously on the roof deck, then roll the membrane to install it to be fully sticked to roof deck.
By heating and melting method and by cold adhesive can be used in alternation in application as requested.                                              

c)After application,a full serious inspection is required to sure no air bubble,no falling away.etc. to guarantee the waterproof life.

Attentions for construction

Construction shall not be carried out in rain, snow or over 5 degree wind weather; Thereshall be sufficient safety protective facilities in construction site, place firefighting devices according to stipulations

1)Clean the substrate using broom or high pressure dusty cleaner

2)Apply primer

3)Heat the membrane bottom using a high temperature flame gun

4)Push forward while the primer and membrane oil melted

5)Use a roller to push hard the membrane surface to ensure it stick firmly