Prefab Villa Light Steel Villa Price/Light Steel Villa Housing Price

Loading Port:Guangzhou

Payment Terms:TT OR LC

Min Order Qty:50 m²

Supply Capability:10000 m²/month

Product Description:

Prefab villa light steel villa price/light steel villa housing price


Specifications

1.Quickly to assemble on site; 
2:Good earthquake proof; 
3.Green,and energy save; 
4.Design for customers; 
5.Green,Energy save 

 

Detailed Features

(1) Steel Structure

Light Guage Steel Villa is more stable than the one that made of welding frame steel . Besides, it is cheaper, more economic. With long lifespan,  which can last almost 70 years, all the materials of light guage steel villa is Q550.  It is locked with bolts, which can be used repeatedly without any maintenance.

 

(2) Flooring

Decoration:PVC flooring,carpet,laminated flooring ,solid wood flooring 

Floor:Plywood ,galvanized deck +concrete,calcium silicate board

Insulation layer:glass wool

Floor purlins:rectangular pipes and C-shaped steel 

Floor beam:rectangular tube,pipe truss,truss angles ,hot-rolled steel H 

Ceiling:calcium silicate ceiling 

  

(3) Windows and Doors

Windows: Double glazing plastic-steel or aluminum alloy thermal-insulating frames

Doors: steel security gate doors; wood or molded doors

 

(4) Composite Wall System (thickness:150-250mm)

Decorative layer :PVC cladding ,PU metal cladding ,single metal cladding ,calcium silicate board

Insulation:EPS sandwich panel,PU sandwich panel ,glass wool sandwich panel

Ring beam:Cold rectangular tube ,pipe truss.

Steel column:Cold rectangular pipe,hot rolled steel H 

 

(5) Roofing System

1. Asphalt tile

2. Cement tile

3. Clay tile

4. Color steel tile

5. Glass fiber tile

 

Packing and delivery:

one 40’HQ container can load all the materials for about 200 square meters

 Prefab Villa Light Steel Villa Price/Light Steel Villa Housing Price

 

Installation

it takes 10 workers 30-45 days to install a villa for 250 square meters.

Prefab Villa Light Steel Villa Price/Light Steel Villa Housing Price

 

FAQ of Prefabricted Houses

 

1.    Q: How much is this house?

A: Please provide with your house drawing and project location, because different design, different location effect the house materials quantity and steel structure program.

2.    Q: Do you do the turnkey project?

A: Sorry, we suggest customer to deal with the foundation and installation works by self, because local conditions and project details are well knowb by customers, not us. We can send the engineer to help.

3.    Q: How long will your house stay for use?

A: Our light steel prefab house can be used for about 70 years.

4.    Q: How long is the erection time of one house?

A: for example one set of 200sqm house, 8 workers will install it within 45 days.

5.    Q: Can you do the electricity, plumbing and heater?

AThe local site works had better to be done by the customers.