Prefab Light Steel Villa for Home or Office (Supplier/Manufacturer)

Loading Port:Guangzhou

Payment Terms:TT or LC

Min Order Qty:100 m²

Supply Capability:10000 m²/month

Product Description:

Prefab Light Steel Villa for Home or Office (Supplier/Manufacturer)


1. Brief description of Light Steel Villa

 

Light steel structure villa specification

Key Features

Item Title

Materials Description

House body

Main structure

Light Steel Structure, steel column, Structure board

Exterior wall decoration

90 steel stud, glass wool, 10mm calcium silicate board, moisture-proof film, 19*50 steel stud, fiber cement board, exterior wall water-proof

Roof/Cornice

Roof: Single-layer bituminized tiles, 3mm SBS water-proof rolling material, 15mm OSB board
Cornice:75mm steel stud, calcium silicate board, putty paint

Rain carrying system

PVC rain carrying system

Doors and windows

Security door, paint-free door, glass door, plastic steel window, artificial marble

Finishing

Interior wall decoration

Ceiling grid, second floor 75*2 glass wool, first floor 75mm glass wool, waterproof moisture-proof membrane, 9.5mm plaster board, putty paint

Interior ceiling

Fire proof gypsum board, putty and paint

Water and electricity pipes

Water supply PPR pipe, drainage PVC pipe
Switch socket panel, lamp

Indoor ground

Floor and accessories, kitchen and washing room tile

Other materials

Closet, washing basin, sink, shower

Installation

To install 200m2 house needs only 45 days by 6 professional

     workers

Loading quantity

One 40' container can load 140 m2

Wind load

130km/h

Anti-seismic grade

9 degree

Life span

Around 70 years

Remarks

This specification is for the reference, if there are differences between actual condition, the adjusting is according to the actual condition.


2. Characteristics and specifications of  Light Steel Villa

1) Galvanized steel or powder coated steel as the major part of structure which is firm and durable, it has quite good capacity to resist corruption.

 

2) The main material of the wall, roof is light and strong. It is produced by injected EPS, PU or rook wool between 2 steel sheets. They have quite good capacity of water proof, moisture proof and heat resistance.

 

3) The light steel structure with the good quality sandwich panel could resist different weather, such as typhoon, heavy rain and earthquake.

 

4) Almost dry construction, the assemble of steel villa do not need much water, which is more environmental friendly than building the concrete building. It adapts to the eco trend.

 

5) Water pipe and wires could be fixed into and be hidden into the sandwich panel which is good looking.

 

6) Good to design and decorate. The floor and wall could be decorated by different material according to the user’s idea.

 

7) Wide-range in application, it can be widely applied in Villa, vacation village, low-rise residence, hotel, Civil or Commercial Building. And average using cost is less than other kinds of building annually.

 

3. Photos of Light Steel Villa

 

Prefab Light Steel Villa for Home or Office (Supplier/Manufacturer)

Prefab Light Steel Villa for Home or Office (Supplier/Manufacturer)

Prefab Light Steel Villa for Home or Office (Supplier/Manufacturer)

 

 

4. Production Materials Selection of Light Steel Villa

 

 

 

 

5. FAQ of Light Steel Villa

 

1.    Q: How much is this house?

      A: Please provide with your house drawing and project location, because different design, different location effect the house materials  quantity and steel structure program.

 

2.    Q: Do you do the turnkey project?

     A: Sorry, we suggest customer to deal with the foundation and installation works by self, because local conditions and project details are well knowb by customers, not us. We can send the engineer to help.

 

3.    Q: How long will your house stay for use?

     A: Our light steel prefab house can be used for about 70 years.

 

4.    Q: How long is the erection time of one house?

     A: for example one set of 200sqm house, 8 workers will install it within 45 days.

 

5.    Q: Can you do the electricity,plumbing and heater?

      AThe local site works had better to be done by the customers.