Polymer External Wall Putty (Two component) EWP

Loading Port:China main port

Payment Terms:TT OR LC

Min Order Qty:10000 kg

Supply Capability:50000 kg/month

Product Description:

Polymer External Wall Putty
(Two component)
 

Features of Performance
High strength, excellent water, alkali and freeze-thaw resistance. High adhesion to surface of various walls and exterior coatings.
It has good waterproof property, high crack resistance because imported hydrophobic polymer is incorporated in the formulation.
The disadvantage of using traditional primer. such as random selection of materials and mixing ratio, low strength and poor water, alkali resistance, can be overcome. Moreover, workload and labor are saved, application is easier.

Scope of Application
It is widely used as a primer on external wall of various buildings including the walls made from cement mortar, concrete, TK board, gypsum board, pearlier board, aerated concrete block etc. providing flat, smooth and strong substrate for finishing of the external wall. The decorative effect of the wall finish can be greatly enhanced and service life of the exterior coating can be extended.

Technical Specification
 

Item

Index

Application property

Easy to apply with no obstacle, easy to be sanded

Dry time (surface dry) h

< 5

Water resistance (48h)

No abnormal phenomenon

Alkali resistance (24h)

No abnormal phenomenon

Bonding strength standard state (Mpa)

> 1.0

Freeze-thaw resistance (10 cycles)

No blisters, no peeling, no cracks, no notable change

Early crack resistance upon drying

No cracks appearing


Application Instruction
1. Mixing ratio :Liquid Putty: Putty Powder=1:2.5. Before application they must be stirred evenly first, the paste should be used up within 6 hours.
2. Adopts scraping method. Polish immediately after the layer is dry completely (approx. 3-4 hours), otherwise the putt), glue will be indurations cause smooth difficulty. Usually the external wall paint can be brushed after three days.

Theoretical Application Rate
1 m 2 /kg if the wall surface is fiat(two lays).

Package
Liquid putty 50kg/drum. Putty powder25kg, laminated paper bag.
Quality Guarantee Period
12 Months if stored in warehouse under the condition of 0- 40 degree C.

Notice
 New cement screed wall should be cured for more than 20 days in winter and more than 10 days in summe