Ms Heavy Steel Rail 50Mn, U71Mn

Loading Port:Qingdao Port,China

Payment Terms:TT or LC

Min Order Qty:25MT m.t.

Supply Capability:1000000MT/YEAR m.t./month

Product Description:

Specificaions of Ms Heavy Steel Rail 50Mn, U71Mn

Production Standard: GB2585-81

Material: 50Mn, U71Mn

Grade

Element(%)

C

 

Mn

S

 

P

 

Si

 

 

50Mn

 

0.48—0.56

 

0.70—1.00

 

≤0.035

 

≤0.035

 

 

0.17-0.37 

U71Mn

0.65—0.76

1.10—1.40

≤0.030

≤0.030

0.15-0.35

Sizes: 38kg, 43kg, 45kg, 50kg, 60kg

Length: 10m, 12m, 12.5m or as the requriement of the clients

Ms Heavy Steel Rail

Ms Heavy Steel Rail

Invoicing on theoretical weight or actual weight as customer request

Payment terms: 30% advance payment by T/T, 70% payment against the copy of the B/L; 100% L/C at sight, etc.

Usage & Applications of Ms Heavy Steel Rail 50Mn, U71Mn

Heavy Steel Rail is suitable for the laying of main trunk line of the curves and the orbit of the tunnel, can also be used for tower crane and other crane track.

For example: railway, subway, transportation track, express, curve way, tunnel way.

Ms Heavy Steel Rail 50Mn, U71Mn

Packaging & Delivery of Ms Heavy Steel Rai 50Mn, U71Mn

1. Packing: it is nude packed in bundles by steel wire rod

2. Bundle weight: not more than 3.5MT for bulk vessel; less than 3 MT for container load

Ms Heavy Steel Rail

3. Marks:

Color marking: There will be color marking on both end of the bundle for the cargo delivered by bulk vessel. That makes it easily to distinguish at the destination port.

Tag mark: there will be tag mark tied up on the bundles. The information usually including supplier logo and name, product name, made in China, shipping marks and other information request by the customer.

If loading by container the marking is not needed, but we will prepare it as customer request.

4. Transportation: the goods are delivered by truck from mill to loading port, the maximum quantity can be loaded is around 40MTs by each truck. If the order quantity cannot reach the full truck loaded, the transportation cost per ton will be little higher than full load.

5. Delivered by container or bulk vessel

Ms Heavy Steel Rail 50Mn, U71Mn

6. Delivery Time: All the Ms Heavy Steel Rail will be transpoted at the port of Tianjin, China within 30 days after receiving the advance payment by T/T or the orginal L/C at sight.

Production flow of Ms Heavy Steel Rail 50Mn, U71Mn

Material prepare (billet) —heat up—rough rolling—precision rolling—cooling—packing—storage and transportation

Inspection of Ms Heavy Steel Rail 50Mn, U71Mn

We will send the MTC of the factory to the clients dirrectly which contain the anlisis of the heat, chemiqul composition, phisical characteristicas, etc.

And our inspectors will arrive at the factory to meke the inspection of the size, length, weight and quantity before the transportation from the factory.

Ms Heavy Steel Rail 50Mn, U71MnMs Heavy Steel Rail 50Mn, U71Mn