Hot-Dip Galvanized Steel Coil with Prime Quality

Loading Port:Shanghai

Payment Terms:TT OR LC

Min Order Qty:200 m.t.

Supply Capability:10000 m.t./month

Product Description:

1.Structure of Galvanized Steel Coil Description

Hot-dip galvanized steel coils are available with a pure zinc coating through the hot-dip galvanizing process. It offers the economy, strength and formability of steel combined with the corrosion resistance of zinc. The hot-dip process is the process by which steel gets coated in layers of zinc to protect against rust. It is especially useful for countless outdoor and industrial applications.

2.Main Features of the Galvanized Steel Coil

• Base material for countless outdoor and industrial applications

• High corrosion resistance

 High strength

 Good formability

• Rust- proof ability

• Good visual effect

3.Galvanized Steel Coil Images

Hot-Dip Galvanized Steel Coil with Prime  Quality 

 

4.Galvanized Steel Coil Specification

Operate Standard: ASTM A653M-04/JIS G3302/DIN EN10143/GBT 2518-2008

Grade : SGCD,SGCH, Q195,DX51D

Zinc coating :40-180g( as required)

Width:914-1250mm(914mm, 1215mm,1250mm,1000mm the most common)

Coil id:508mm/610mm

Coil weight: 4-10 MT(as required)

Surface: regular/mini/zero spangle, chromated, skin pass, dry etc.

Hot-Dip Galvanized Steel Coil with Prime  Quality

Hot-Dip Galvanized Steel Coil with Prime  Quality

 

5.FAQ of Galvanized Steel Coil 

We have organized several common questions for our clients,may help you sincerely: 

1.How to guarantee the quality of the products?

We have established the international advanced quality management system,every link from raw material to final product we have strict quality test;We resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.

2. What is the minimum order quantity ?  

Our MOQ is 50mt for each size. And we will consider to give more discount if you make big order like 1000 tons and more. Further more, the more appropriate payment term your offer the better price we can provide. 

3.How long can we receive the product after purchase?

Usually within thirty working days after receiving buyers advance payment or LC. We will arrange the factory manufacturing as soon as possible. The cargo readiness usually takes 15-25 days, but the shipment will depend on the vessel situation.