High Strength Warp Knitting Polyester Geogrids for road construction

Loading Port:Qingdao

Payment Terms:TT OR LC

Min Order Qty:30000 m²

Supply Capability:1000000 m²/month

Product Description:

Structure of Warp Knitting Polyester Geogrids

Warp Knitting Polyester Geogrids is with polypropylene, high density polyethylene as raw materials, made by special extrusion, two-way stretch.It Can reduce structural fill, uniform load distribution, and has high two-way tensile modulus and tensile strength, high mechanical damage ability, endurance ability.

Main Features of the Warp Knitting Polyester Geogrids

Packaging & Delivery

Packaging Details:PP bags or PE film. Or Packed as customers' requests.
Delivery Detail:10-20days after the contract is effective

 

Warp Knitting Polyester Geogrids Images

 

High Strength Warp Knitting Polyester Geogrids for road construction

High Strength Warp Knitting Polyester Geogrids for road construction

High Strength Warp Knitting Polyester Geogrids for road construction

 

 

 

Warp Knitting Polyester Geogrids Specification

 

ItemTensile strength(KN/m)Tensile strength at 2% elongationTensile strength at 5% elongationNomianal elongationProducts in the range   of coal mine
TGSG15-15≥15.0≥5.0≥7.0≤15.0/13.0Fire out time from outer flam(s)Surface resistivity
TGSG20-20≥20.0≥7.0≥14.0≤3<1×109
TGSG25-25≥25.0≥9.0≥17.0
TGSG30-30≥30.0≥10.5≥21.0
TGSG35-35≥35.0≥12.0≥24.0
TGSG40-40≥40.0≥14.0≥28.0
TGSG45-45≥45.0≥16.0≥32.0
TGSG50-50≥50.0≥17.5≥35.0

 

FAQ

We have organized several common questions for our clients,may help you sincerely:

Q: How about your company?

A:Our company are one of the largest geosynthetic products supplier in the world.We have the products experience more than 20 years.Already export to USA/Germeny/Australia/Zambia/Brazil etc.more than 20 countries.Almost 10years.Our products including Geocell/Fiberglass Geogrid/Geomembrane/Geotextile/Geonet etc.

Q.Does your products have good qualitity?

A:Yes,we have do many big projects such as the 2008 Beijing Olympic BIRD NEST. Divert water from the south to the north project. And our products have CE certificate also.

Q:How long can we receive the products after purchase?

A:In the purchase of product within three working days, We will arrange the factory delivery as soon as possible. The pecific time of receiving is related to the state and position of customers.Commonly 15-20 working days can be delivery.