Geomembrana 0.5 mm of HDPE for The Dam Made in China

Loading Port:Qingdao

Payment Terms:TT OR LC

Min Order Qty:5000 m²

Supply Capability:100000 m²/month

Product Description:

Geomembrana 0.5 mm of HDPE for The Dam Made in China



Description Of Geomembrana 0.5 mm of HDPE for The Dam Made in China

Geomembrane is a plastic Film Raincoat. Currently, the main raw materials of Waterproof Geomembrane are mainly Plastic polyvinyl chloride (PVC) and polyethylene (PE), Eva (ethylene / vinyl acetate Copolymer), also designed for Special use in applications of Tunnel (ECB Ethylene vinyl acetate Modified Asphalt mixture Geomembrane).


Main Features of Geomembrana 0.5 mm of HDPE for The Dam Made in China

Polyethylene (PE) geomembrane is divided into low-density polyethylene (LDPE) geomembrane, linear low density polyethylene (LLDPE) geomembrane


 Applications of Geomembrana 0.5 mm of HDPE for The Dam Made in China
1.HDPE geomembrane is applicable to hydraulic engineering: such as seepage control, plugging, reinforcement for rivers, lakes and reservoirs and dams, drainage seepage control, vertical core wall, slope protection, etc.
2. HDPE geomembrane's applications in municipal engineering: subway, underground works of the building, planting roof, roof garden, sewage pipe seepage control;


IMages of Geomembrana 0.5 mm of HDPE for The Dam Made in China

Geomembrana 0.5 mm of HDPE for The Dam Made in China

Geomembrana 0.5 mm of HDPE for The Dam Made in China

Geomembrana 0.5 mm of HDPE for The Dam Made in China

Geomembrana 0.5 mm of HDPE for The Dam Made in China

Geomembrana 0.5 mm of HDPE for The Dam Made in China

Geomembrana 0.5 mm of HDPE for The Dam Made in China

Geomembrana 0.5 mm of HDPE for The Dam Made in China



FAQ:

 

1. What are we supplying?

We are specialized in producing .geotextile , geocell, geogrid, geomembrane

2. How Many years experience do we have?
We have been exported to more than 15 countries in the past 10 years.

3. How long do we usually reply your request?

We always reply our customer within 12 hours.