Geo Bags For Controlling Soil Erosion on River Banks

Loading Port:Qingdao

Payment Terms:TT OR LC

Min Order Qty:10000 m²

Supply Capability:500000 m²/month

Product Description:

 Structure of Geo Bags For Controlling Soil Erosion Description:

The isolation of the railway dregs and the roadbed, roadbed and the soft base, surface of the airdrome and parking lot and the groundsill, different dam materials. It isolates the soil and the gravel of two kinds different granule pathway from the groundsill or other buildings. 

Main Features of the Geo Bags For Controlling Soil Erosion

Geo Bags For Controlling Soil Erosion Images

 

High Tensile  Non Woven Polypropylene  Geotextile for Road Construction

 

High Tensile  Non Woven Polypropylene  Geotextile for Road ConstructionHigh Tensile  Non Woven Polypropylene  Geotextile for Road Construction

 

High Tensile  Non Woven Polypropylene  Geotextile for Road Construction

 

 

Geo Bags For Controlling Soil Erosion Specification


raw materialPET continuous filament fabric /PET staple fiber fabric
colorwhite/black/grey or as your request
gsm100g/m2 to 800g/m2
roll sizewidth(1m to 6m),length(50m to 200m)
processspun-bonded,needle punched,if required,heat-set is also available
packingPP woven plastic bags
projectroad construction,geomembrane protection,river bank erosion control,etc

 

FAQ

We have organized several common questions for our clients,may help you sincerely:

Q1: How about your company?

A1:Our company are one of the largest geosynthetic products supplier in the world.We have the products experience more than 20 years.Already export to USA/Germeny/Australia/Zambia/Brazil etc.more than 20 countries.Almost 10years.Our products including Geocell/Fiberglass Geogrid/Geomembrane/Geotextile/Geonet etc.

Q2:Can you send samples to us ? 

A2:Yes , free samples could be provided , but customer need pay for the freight cost . 

   After order placed , the freight charge could be refund . 

Q3:What’s your Payment term ?

A3:T/T , L/C , Western Union,Paypal ... 

Q4:What’s your manufacture process time ? 

A4:Usually within 20 days