Fiberglass Geogrid with High Tensile Strength

Loading Port:Qingdao

Payment Terms:TT OR LC

Min Order Qty:3000 m²

Supply Capability:1000000 m²/month

Product Description:

Structure of Fiberglass Geogrid

 Fiberglass geogrid is A kind of planar mesh material using alkali-free fiberglass yarn as base body and

then coated with high quality modified asphalt.. The products after surface covering own the favorable property of alkali resistance and aging resistance

Main Features of the Fiberglass Geogri

Packaging & Delivery

Packaging Details:PP bags or PE film. Or Packed as customers' requests.
Delivery Detail:10-20days after the contract is effective

 

Fiberglass Images

 

Fiberglass Geogrid with High Tensile Strength

Fiberglass Geogrid with High Tensile Strength

Fiberglass Geogrid with High Tensile Strength

 

 

 

Fiberglass Geogrid Specification

 

Property

Test Method

TGSG

15-15

TGSG

20-20

TGSG

30-30

TGSG

40-40

Ultimate tensile strength(1)  (kN/m)

MD

 

 

 

 

 

 

ASTM D 6637

15

20

30

40

CD

15

20

30

40

Elongation at maximum load (%)

MD

13

CD

13

Tensile strength at 2 % elongation (kN/m)

MD

5

7.5

10.5

14

CD

5

7.5

10.5

14

Tensile strength at 5 % elongation (kN/m)

MD

7

14

21

28

CD

7

14

21

28

Minimum Carbon Black

%

ASTM D 4218

2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

FAQ

We have organized several common questions for our clients,may help you sincerely:

Q: How about your company?

A:Our company are one of the largest geosynthetic products supplier in the world.We have the products experience more than 20 years.Already export to USA/Germeny/Australia/Zambia/Brazil etc.more than 20 countries.Almost 10years.Our products including Geocell/Fiberglass Geogrid/Geomembrane/Geotextile/Geonet etc.

Q.Does your products have good qualitity?

A:Yes,we have do many big projects such as the 2008 Beijing Olympic BIRD NEST. Divert water from the south to the north project. And our products have CE certificate also.

Q:How long can we receive the products after purchase?

A:In the purchase of product within three working days, We will arrange the factory delivery as soon as possible. The pecific time of receiving is related to the state and position of customers.Commonly 15-20 working days can be delivery.