E Glass Assembled Roving Used in Filament Winding for Petroleum Pipes with Good Quality

Loading Port:Shanghai

Payment Terms:TT OR LC

Min Order Qty:10000 kg

Supply Capability:1000000 kg/month

Product Description:

Product introduction 

It is a Fiberglass roving produced by directly winding a certain number of individual fibers form the bushing without twist,it is coated with a silane-based size and is designed for reinforcing unsaturated polyester, epoxy,vinyl ester and phenolic resins. it is specially used to produce GRP pipes, pressure vessels, gratings and profiles and, when converted into woven roving, boats and chemical storage tanks, with filament winding, pultrusion and weaving process.

.

E  Glass Assembled Roving Used in Filament Winding for Petroleum Pipes with Good Quality

Specifications:

 

LINEAR DENSITY

(%)

MOISTURE CONTENT

(%)

SIZE CONTENT

(%)

STIFFNESS

(MM)

NET WEIGHT

(KG)

±6

≤0.15

2.00 ±0.30

165 ±25

 25.0 ±0.5

Features:

GOOD CHOPPABILITY;

GOOD STRAND INTEGRITY, NO FUZZ AND LOOSE FIBER;

GOOD DISPERSION;

EXCELLENT ANTI-STATIC PROPERTY;

EXCELLENT FLOWABILITY;

EXCELLENT MECHANICAL PROPERTY.

E  Glass Assembled Roving Used in Filament Winding for Petroleum Pipes with Good Quality

E  Glass Assembled Roving Used in Filament Winding for Petroleum Pipes with Good Quality

Packaging:

It is available in small,single doff carton boxes but are generally palletized. Individual doffs nominally weigh 15.6kg or 22kg..

In the case of palletizing,each package is wrapped in shrink plastic film, each pallet contains 3 or 4 layers with 16 packages,totaling 48 or 64 doffs per pallets. All pallets are stretch wrapped and strapped. The way of splicing dependent upon customer requirements.

Storage:

Unless otherwise specified, fiberglass product should be stored in a cool, dry rain-proof area.it is recommended that the room temperature and the relative humidity be always maintained between 15-35 ℃ and 3565% respectively. To ensure safety and avoid damage to the product, the pallets should not be stacked more than 3 layers high. When the pallets are stacked in 2 or 3 layers,care should be taken to correctly and smoothly remove the top pallet

FAQ:

1.What is your delivery time ?

7-15days after receiving the deposit

2.What is your shipping port?

Normally shanghai port,it can be done on customer's request