Loading Port:China Main Port
Payment Terms:TT OR LC
Min Order Qty:-
Supply Capability:-
Detailed introduction to EPS house:
1 Structure is reliable :Light steel structure system is safe and reliable ,satisfied modern architecture concept.
2 Easy assembly and disassembly : The house can be assembled and disassembled many times,used repeatedly. It just need simple tools to assemble .each worker can assemble 20-30 square meters every day ,6 worker can finish 300 sqm prefab house in 2 days.
3 Beautiful decoration : the prefab house is beautiful and grace ,have bright and bland colour , flat and neat board , with good decoration effect.
4 Flexible layout : Door and window can be assembled in any position , partition wall panel can be assemble in any transverse axes sites ,stair is assembled in outside.
5 Using life : All the light steel structures have antisepsis-spraying treatment.the normal using age are above 15 years.
6 Environmental protection and economy : Prefab house design is reasonable, easy to assemble and disassemble,used circularly,low wastage,without building rubbish. Average using costing is less than other kinds of building annually.
ITEM | SANDWICH PANEL | LENGTH THICKNESS | 950MM 50MM | ||||||
QUANTITY | 1M2 | DATE | 2013-12-4 | ||||||
ITEM | STANDARD | RESULT | MEMO | ||||||
| 1 | COLOR | Conformity in same batch | Conformity | Qualified | ||||
2 | CRACK | No | No | Qualified | |||||
3 | INDENTATION | Not obviously | Not obviously | Qualified | |||||
4 | SIZE | LENGTH | ±2mm | 51mm | Qualified | ||||
THICKNESS | ±20mm | 950mm | Qualified | ||||||
5 | DENSITY kg/m2 | >=10.5% | 10.8% | Qualified | |||||
6 | STRIPPING PERFORMANCE | >=85% | 87% | Qualified | |||||
7 | MPA | >0.1 | 0.11 | Qualified | |||||
CONCLUSION | Qualified | ||||||||
| | | | | | | | | |
Note:
1.Price no including the transport and installation cost, no including foundation cost,floor and ceiling cost,water and electricity cost.
2.Validity: This quotation sheet is valid for 15 days due to the unstable RMB exchange rate.
3.Payment term:30% T/T deposit before production, the balance 70% T/T need to pay before delivery.
4.Packing:Flat pack.
5.Delivery time:15 days after receive the 30% deposit. (The quantity is less than 5000㎡)
6.All price not listed in above project need to calculate separately.