Concrete Delivery Pipe for Cifa Concrete Pump

Loading Port:Tianjin

Payment Terms:TT OR LC

Min Order Qty:20 pc

Supply Capability:2000 pc/month

Product Description:

Concrete Delivery Pipe for Cifa Concrete Pump


1.   Structure of Concrete Delivery Pipe for Cifa Concrete Pump:


Include four types

St52 Weld Pipe: Main use for Trailer-mounted pump, thickness has 4.0mm, 4.5mm, 5mm. Compare with for Truck-mounted pump. Weld pipe has cheaper price, so it is popular in Saudi, Pakistan, India, etc. Unit Price is about 30USD-33USD.

 

St52 Seamless Pipe: Now More People like use this kind for Truck Pump and Trailer Pump because of the quality is better and it is seamless kind, so this kind pipe is most popular in Middle East Price About 34USD-37USD.

 

Wear Resistant Pipe: Use for Truck Pump, Wear Resistant Layer is 2.5mm.Through heat treatment way make this pipe more strong (HRC60-62), Using Life: 25,000m³-35,000m³ Price about 65USD-68USD.

 

Two Wall Pipe: This pipe thickness (2mm+2.5mm), Using Life about 50,000m³-60,000m³

 

 2.   Main Features of Concrete Delivery Pipe for Cifa Concrete Pump:

 

• High Wear-resistant, long service life, lower cost

• In case of quality problem the company provide free replacement.

• Provide technical support for free.

• Provide consumers with regular visits

• Ensure the supply of ancillary parts

• Our company passed the ISO9000 certification, the product through 3C certification in full compliance with national standards

 

3.  Concrete Delivery Pipe for Cifa Concrete Pump Images:

 

Concrete Delivery Pipe for Cifa Concrete Pump

Concrete Delivery Pipe for Cifa Concrete Pump

4.  Concrete Delivery Pipe for Cifa Concrete Pump Specification: 


Concrete Delivery Pipe for Cifa Concrete Pump

Name

Data

Material

45MN2/20#/16MN/Q345

Thickness

According to customer requirements

Color

red, white , etc.

Using life

20.000m³-80.000m³

Weight

43kg,48kg,69kg

Length

1-6m,  according to customer requirements

Model

DN125,DN150

Flange

SK/ ZX /FM flange

Painting

Electrostatic Spraying Epoxy Paint

Welding

Smooth welding between straight pipes and flanges

Process

High temperature quenching

HRC

65

 

 

Production Process

 Concrete Delivery Pipe for Cifa Concrete Pump

5. FAQ:

 

We have organized several common questions for our clients, may help you sincerely:

①Is your products exported a lot?

We have exported to many, many countries. Every year we ship more than 30 containers of these spare parts. Our main market is in Middle-east, Asia & Africa.

②How to guarantee the quality of the products?

We have established the international advanced quality management system,every link from raw material to final product we have strict quality test;We resolutely put an end to unqualified products flowing into the market. At the same time, we will provide necessary follow-up service assurance.

③How long can we receive the product after purchase?

In the purchase of product within three working days, we will arrange the factory delivery as soon as possible. The specific time of receiving is related to the state and position of customers. Commonly 15 working days can be served.