Concrete Culvert Pipe Machine for Building Construction

Loading Port:China main port

Payment Terms:TT OR LC

Min Order Qty:1 set

Supply Capability:50000 set/month

Product Description:




Concrete Culvert Pipe Machine for Building Construction

 


Product Description:


 

Concrete Culvert Pipe Machine for Building Construction

       According to Concrete pile strength , there are PHC piles, and PC piles, According to different wall thickness, there 

are PC piles and PTC piles. Spun pile production line is used to produce High strength Cocrete piles. The popular 

specification of PHC piles are3 00mm ,400mm, 500mm, 600mm, 800mm and 1000mm, the length can be 7-15 meters, or 

we can design the mould according to your request.


Concrete Pile spinning machine with steel pile mold are driven by variable frequency and variable speed regulating motor,

 and rotate at high speed to remove wet slurry and make concrete close to the inner wall of pile mold. 


 

Concrete pile steel mould is used for producing square or round concrete spun piles . 


The length of finished product is from 6,18m, and the diameter of finished products is 250-800mm.

 

Working Principle:

 

1. This spun pile steel mould shall operate together with pile spinning machine.

 

2. This mould forms pile under the force of  centrifugal. There are longitude stiffeners and latitude stiffeners on the mould 

surface.

 

3. The mould rotates in high speed under the motor driven. The redundant water in the slurry is released by the force of

 centrifugal, and the concrete is dense and high in strength. And the spun pile is formed around the inner wall of the mould.


 

 

Technical Parameter: (We also accept customised)

 

 



Our concrete pile machine features:

 

1. We keep absorbing  advantages of similar advanced products all over the world to keep our products alway going first .

 

2. The structure of this mould is novel, they are made in sections, and couple with bolts.

 

3. This spun pile mould is easy to transport and quick to assemble. Positioning is accurate.

 

4. It has good overall rigidity and smooth operation.

 

Concrete Culvert Pipe Machine for Building Construction

 

 

Our concrete pile machine advantage:

 

1. Saving a great deal of steel, about 30~70% (employing cold drawn steel wire can save 30%~60%; employing high stress

 steel wire can save 40%~69%).

 

2. Crack resistance can increase about 3~5 times

 

3. Rigidity increases 1~3 times.

 

4. Reducing the cost (using cold drawn steel wire can reduce 25%~40%; using high stress steel wire can reduce 12%~21%).

 

5. Good durability, can delay the existence and expansion of cracks.

 

6. Protect the environment on which human beings depend on for existence, and reduce the deforestation



FAQ:

 

Q1: Why buy Materials & Equipment from OKorder.com?

A1: All products offered by OKorder.com are carefully selected from China's most reliable manufacturing 

enterprises. Through its ISO certifications, OKorder.com adheres to the highest standards and a commitment to 

supply chain safety and customer satisfaction.

Q2: How do we guarantee the quality of our products?

A2: We have established an advanced quality management system which conducts strict quality tests at every 

step, from raw materials to the final product. At the same time, we provide extensive follow-up service assurances 

as required.

Q3: How soon can we receive the product after purchase?

A3: Within three days of placing an order, we will begin production. The specific shipping date is dependent upon

 international and government factors, but is typically 10 to 30 workdays.

Q4: If we can produce some wood products according to customers request?

A4: Yes, we can produce wood products according to the difference country situations to make it suitable to the 

market and customers. We have very professional technical team to make the design.

Q5: How to make a quick resolution for after service?

A5: OKorder and our manufacture both have overseas branches all-around of world, IF needed, the seller shall 

dispatch 2 engineers to the buyer's site for supervision of training. The buyer shall make available of necessary 

facilities & skilled personnel at site for training.